2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
Delayed Projects from the 2011/14 MTIP<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
SAC City of Rancho Cordova SAC24180 Pedestrian Promenade<br />
SAC<br />
SAC<br />
City of Sacramento Dept<br />
of <strong>Transportation</strong> SAC24656 14th Ave. Extension Phase 2<br />
City of Sacramento Dept<br />
of <strong>Transportation</strong> SAC24657 14th Ave. Extension Phase 3<br />
Bicycle and pedestrian overcrossing of U.S. 50 connecting Olsen<br />
Drive to Prospect Park Drive as defined in The Promenade:<br />
Connecting and Revitalizing Rancho Cordova Planning Study<br />
(reference SAC24157). 2020 $8,500,000<br />
Sacramento. 14th Ave., from Power Inn Road to Florin Perkins,<br />
widen from 2 to 4 lanes. Construction includes bike lanes,<br />
landscaped center median, landscaping and sidewalk on north side<br />
of street. Retaining wall along north side of project. (PE/ENV<br />
included in Phase 1, SAC24610) 2020 $3,750,000<br />
Sacramento. 14th Avenue from Florin‐Perkins Rd to Watt Ave:<br />
extend as a four lane road. 2025 $8,500,000<br />
SAC<br />
SUT<br />
SUT<br />
SUT<br />
City of Sacramento Dept<br />
of <strong>Transportation</strong> SAC24499 Docks Riverfront Promenade<br />
City of Yuba City Dept of<br />
Public Works SUT10530 Franklin Avenue<br />
Sutter County Dept of<br />
Public Works SUT10510 Pacific Avenue<br />
Sutter County Dept of<br />
Public Works SUT10490 Riego Road<br />
In Sacramento, extend pedestrian/bicycle riverfront promenade<br />
from R St to Pioneer Bridge. Relocation and reconstruction of main<br />
rail line. Pedestrian/bicycle paths, benches, lighting, interpretative<br />
signs, rail crossings, and on‐street bicycle lanes. 2020 $12,518,290<br />
Widen Franklin Avenue from 2 to 4 lanes from Route 99 to Clark<br />
Avenue. 2020 $5,224,500<br />
Widen Pacific Avenue from 2 to 4 lanes from Sankey Road to Riego<br />
Road. 2020 $6,800,000<br />
Riego Rd: Widen from 2 to 4 lanes from Route 99/70 to 2 miles<br />
westward. 2020 $1,500,000<br />
SUT<br />
YOL<br />
YOL<br />
YUB<br />
YUB<br />
YUB<br />
Sutter County Dept of<br />
Public Works<br />
SUT18830<br />
SR 99 Intersection<br />
<strong>Improvement</strong>s<br />
Intersection improvements to add turn lanes, address drainage<br />
issues and sound attenuation as needed along both sides of State<br />
Route 99 at Bogue Rd, Lincoln Rd, Richland Rd and Franklin Rd. 2020 $3,800,000<br />
City of Woodland Dept of<br />
In Woodland, from Kentucky Ave to Beamer St, on CR102: widen<br />
Public Works YOL17330 County Road 102<br />
from 2 to 4 lanes. 2025 $2,896,851<br />
City of Woodland Dept of<br />
Kentucky Avenue Widening Widen Kentucky Avenue from College Street to West Street from 2<br />
Public Works<br />
YOL19307 College to West Streets lanes to 4 lanes. 2035 $3,300,000<br />
Yuba County Dept of<br />
Feather River Blvd Traffic Signal Construct new traffic signal at Feather River Blvd and River Oaks<br />
Public Works<br />
YUB15928 at River Oaks Blvd<br />
Blvd. 2018 $300,000<br />
Yuba County Dept of<br />
Goldfields Parkway Traffic Install new traffic signal at the intersection of North Beale Road and<br />
Public Works<br />
YUB15881 Signal<br />
Goldfields Parkway 2020 $300,000<br />
Yuba County Dept of<br />
Construct 3‐lane collector McGowan Parkway from Arboga Road to<br />
Public Works YUB15950 McGowan Parkway<br />
Union Pacific Railroad. 2020 $1,300,000<br />
YUB<br />
Yuba County Dept of<br />
Public Works<br />
YUB15871<br />
McGowan Parkway and Arboga<br />
Road Traffic Signalization<br />
Install new Traffic Signal at the intersection of McGowan Parkway<br />
and Arboga Road. 2018 $250,000<br />
<strong>2013</strong> MTIP - Page 352 of 390<br />
Delayed Projects: Page 25 of 27