19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sacramento Area Council of Governments<br />

Appendix 4 Project List<br />

SACOG ID YOL15680 Yol Lead Agency City of West Sacramento Dept of Public Works<br />

Project TItle<br />

U.S. 50/South River Road<br />

EA Number:2E600<br />

Last Revised<br />

VAR79052 -<br />

Completion Year<br />

13-00 2020<br />

Grouped Listing Title:<br />

Grouped Projects for Construction or renovation of power,<br />

signal, and communications systems<br />

Project Description<br />

U.S. 50: Install ramp meters and modify ramp design at<br />

South River Rd interchange.<br />

Fed FY Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>2013</strong><br />

2014<br />

2015<br />

20<strong>16</strong><br />

><strong>16</strong><br />

Local - Developer - <strong>Transportation</strong> <strong>Improvement</strong> Fee<br />

Local Agency Funds<br />

Local Agency Funds<br />

Local Agency Funds<br />

$500,000 $500,000<br />

$500,000 $500,000<br />

$750,000 $750,000<br />

$1,750,000<br />

$4,200,000 $4,200,000<br />

$4,200,000<br />

$<strong>16</strong>,675,000 $<strong>16</strong>,675,000<br />

$<strong>16</strong>,675,000<br />

$22,625,000<br />

Other<br />

Total Cost $22,625,000<br />

Exempt<br />

Category:<br />

Interchange reconfiguration projects (Table 3)<br />

SACOG ID CAL17380 VAR Lead Agency Caltrans District 3<br />

Project TItle<br />

EA Number:n/a<br />

Last Revised<br />

VAR79004 -<br />

SACOG Region Emergency Repair <strong>Program</strong><br />

Completion Year<br />

13-00 2017<br />

Grouped Listing Title:<br />

Grouped Projects for Emergency Repair - SHOPP<br />

Emergency Response <strong>Program</strong><br />

Project Description<br />

Lump Sum - Emergency Repair (excluding Federal<br />

Emergency Relief <strong>Program</strong> funds)for non-capacity<br />

increasing projects only.<br />

Fed FY Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>2013</strong><br />

2014<br />

2015<br />

20<strong>16</strong><br />

SHOPP - Emergency Resp. (Emergency Repair - State)<br />

SHOPP - Emergency Resp. (Emergency Repair - State)<br />

SHOPP - Emergency Resp. (Emergency Repair - State)<br />

SHOPP - Emergency Resp. (Emergency Repair - State)<br />

$0<br />

$0<br />

$100,000 $100,000<br />

$100,000 $100,000<br />

$100,000 $100,000<br />

$100,000 $100,000<br />

$400,000<br />

$400,000<br />

Federal Project<br />

Total Cost $400,000<br />

Exempt<br />

Category:<br />

Repair of damage caused by natural disasters, civil unrest, or terrorist acts, except projects involving substantial functional,<br />

locational or capacity changes<br />

<strong>2013</strong> MTIP - Page 212 of 390<br />

Page 92 of 207<br />

Tuesday, September 25, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!