2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Completed Projects from the 2011/14 MTIP<br />
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
YOL<br />
YOL<br />
YOL<br />
YOL<br />
City of Winters Dept of<br />
Public Works<br />
YOL19264<br />
Downtown Streetscape<br />
<strong>Improvement</strong>s Phases 1 & 2<br />
City of Winters Dept of<br />
Public Works YOL19280 Pedestrian Connections<br />
City of Woodland Dept of<br />
Public Works YOL17300 I‐5 / CR 102 Interchange<br />
City of Woodland Dept of<br />
Public Works YOL19294 Pioneer Avenue<br />
In Winters: <strong>Improvement</strong>s to the Downtown Core including, full<br />
sidewalk bulb‐outs, enhanced crosswalks, seat walls or aesthetic<br />
barriers, landscaping and irrigation, street furniture, signage,<br />
lightening enhancements, and enhancements for safety and storm<br />
drainage. 2011 $1,795,000<br />
South side of SR 128 (Grant Ave.), from St. Anthony Parish Hall<br />
driveway to West Main St.: fill in missing sidewalks 2012 $111,500<br />
Reconstruct interchange on I‐5 at County Road 102 including<br />
overcrossing of I‐5. 2012 $<strong>16</strong>,205,459<br />
Construct a new arterial roadway from Farmers Central to Heritage<br />
Parkway. 2012 $1,300,000<br />
YOL United Christian Centers UCC0002 Minivan Purchase Purchase gasoline minivan to expand the fleet. (Toll Credits for CON) 2012 $44,000<br />
YOL<br />
University Transport<br />
System<br />
UNI10360<br />
Unitrans Hutchison Corridor<br />
<strong>Improvement</strong>s<br />
Upgrade bus transit center at UC Davis (Hutchison Corridor),<br />
including off‐street berths, shelter, landscaping, bike racks, and<br />
signage, with no land acquisition or roadway capacity increase. 2012 $1,849,483<br />
YOL<br />
YOL<br />
YOL<br />
YOL<br />
YOL<br />
YOL<br />
YOL<br />
Yolo County Dept of<br />
Public Works YOL19263 County Rd 57 over Cache Creek<br />
Yolo County Dept of<br />
Public Works YOL15984 CR 140 Shoulder <strong>Improvement</strong>s<br />
Yolo County Dept of<br />
Public Works YOL19265 CR 22 Shoulder Widening<br />
Yolo County Dept of<br />
Public Works YOL19250 CR 23 Shoulder <strong>Improvement</strong>s<br />
Yolo County Dept of<br />
Public Works YCT18237 CR 26 Scour Countermeasures<br />
Yolo County Dept of<br />
Public Works<br />
YOL15440<br />
CR 99, CR 29 & CR 99D<br />
Bikeways<br />
Yolo County Dept of<br />
Public Works YOL19274 CR31 and CR93A Rehabilitation<br />
In Yolo County: On County Road 57, over Cache Creek, .42 miles east<br />
of State Highway <strong>16</strong>. Replace the existing structurally deficient one<br />
lane truss bridge with a new two lane bridge. 2011 $3,207,939<br />
County Road 140 between CR 141 and CR 142: widen or improve<br />
shoulders. 2012 $1,120,000<br />
County Road 22 from CR 126 to approximately 2.75 miles north:<br />
Widen shoulders as allowed by levee constraints, rehabilitate<br />
roadway, and install rumble strips along centerline. 2011 $2,608,500<br />
County Road 23 between CR 86A and CR 86B: widen or improve<br />
shoulders. 2011 $777,000<br />
CR 26, over Winters Canal, 0.46 miles east of CR 87. Perform scour<br />
countermeasures for this bridge to eliminate scour critical condition.<br />
(Toll Credits for PE & CON) 2012 $66,000<br />
In Yolo County, CR 99 from CR 27 to CR 29 and CR 29 from CR 99 to<br />
SR 113 and CR 99D from CR 29 to Davis City limits: construct class II<br />
bike lanes by adding four foot shoulders and rehabilitating existing<br />
roadway. 2009 $4,359,071<br />
Reconstruct portion of County Rd. 31 from Davis City limits to<br />
County Rd. 93A, and County Rd. 93A from County Rd. 31 to County<br />
Rd. 32. 2010 $954,259<br />
<strong>2013</strong> MTIP - Page 347 of 390<br />
Completed Projects: Page 20 of 27