Completed Projects from the 2011/14 MTIP<br />

Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

YOL<br />

Yolo County Dept of<br />

Public Works<br />

YOL19282<br />

Yolo County Smart Growth<br />

Implementation Project<br />

In Yolo County, develop a plan to measure, control, and reduce net<br />

greenhouse gas emissions and address economic and social<br />

adaptations of the county to the effects of climate change. 2011 $150,000<br />

YOL<br />

YOL<br />

YOL<br />

YOL<br />

Yolo County<br />

<strong>Transportation</strong> District YCT18248<br />

Madison Bus Stop<br />

<strong>Improvement</strong><br />

This project will design and construct a relocated bus stop serving<br />

the town of Madison. The bus stop will include a bus shelter, bench,<br />

garbage can, schedule display and solar lighting. 2012 $225,000<br />

Yolo County<br />

Transit system signage enhancement, including downtown<br />

<strong>Transportation</strong> District YCT18102 Signage Enhancement Sacramento for all agencies ‐ 2012 $62,500<br />

Yolo County<br />

YCTD FY 10 Preventive<br />

<strong>Transportation</strong> District YCT18099 Maintenance YCTD FY 10 Preventive Maintenance of Yolobus Transit Fleet 2011 $1,269,459<br />

Yolo County<br />

<strong>Transportation</strong> District<br />

YCT18<strong>16</strong>0<br />

Yolobus 13 Bus Purchase Cost<br />

Increase<br />

Increase in procurement cost of 13 ‐ 40’ ft fully equipped high‐floor<br />

transit buses. Due to changes in supply for the desired bus<br />

configuration and required power plant the new estimated cost of<br />

this procurement is approximately $460,000 per unit, $42,000 above<br />

previous estimates. 2011 $538,000<br />

YOL<br />

Yolo County<br />

<strong>Transportation</strong> District<br />

YCT18<strong>16</strong>7<br />

Yolobus Bus Stop Enhancement<br />

Project<br />

Enhance passenger safety, security, comfort, and information by<br />

installing (either adding or replacing) passenger shelters, benches,<br />

shelter and bench pads, solar lighting, information displays at<br />

several locations along Yolobus transit routes. 2011 $264,000<br />

YOL<br />

Yolo County<br />

<strong>Transportation</strong> District<br />

YCT18<strong>16</strong>6<br />

Yolobus ITS Projects/Universal<br />

Fare Card Project<br />

Retrofit and add to the transit fleet and transit operations various<br />

intelligent transportation system (ITS) products to enhance transit<br />

operation, passenger safety, passenger information, passenger trip<br />

planning, passenger mode choice, emergency response, system<br />

security and simplification of fare payment through the regions<br />

universal fare card fare collection system. 2012 $436,000<br />

YOL<br />

Yolo County<br />

<strong>Transportation</strong> District<br />

YCT18<strong>16</strong>2<br />

Yolobus Rehabilitation and Repower<br />

of Nine (9) Transit Buses<br />

YUB Caltrans District 3 CAL20390 SR 65 Maintenance<br />

YUB Caltrans District 3 CAL20445 Yub‐20 Pavement Rehab<br />

YUB Caltrans District 3 CAL18835 Yub‐70 E Street Bridge Rehab<br />

Rehabilitation and re‐power of nine (9) buses to extend their useful<br />

life 2011 $1,350,000<br />

From 3 mi north of Wheatland to 0.9 mi south of Jct SR 70: Perform<br />

highway maintenance. 2011 $3,803,000<br />

Near Marysville, from 0.1 mile east of Levee Road to 0.1 mile west of<br />

Loma Rica Road ‐ Pavement rehabilitation (PM R3.5/8.0) [CTIPS ID<br />

107‐0000‐0848]. 2012 $4,791,000<br />

Yuba County, in Marysville, at Yuba River Bridge Overhead #<strong>16</strong>‐34 ‐<br />

Rehabilitate bridge deck (PM 15.4/25.8) 2011 $3,850,900<br />

<strong>2013</strong> MTIP - Page 348 of 390<br />

Completed Projects: Page 21 of 27