19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />

Deleted Projects from the 2011/14 MTIP<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

ELD<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

El Dorado County Dept of<br />

<strong>Transportation</strong><br />

ELD19357<br />

US 50/El Dorado Hills Blvd.<br />

Interchange Widening<br />

City of Auburn Dept. of<br />

Public Works PLA25230 Dairy Road Realignment<br />

City of Auburn Dept. of<br />

Public Works PLA25229 Nevada Street <strong>Improvement</strong>s<br />

Interchange <strong>Improvement</strong>s: Widen El Dorado Hills Blvd. at US 50<br />

under the overpass, adding 1 south bound lane. (Split from<br />

ELD15630) (Coordinate with ELD19345) 2023 $0<br />

Roadway improvements along Dairy Road from Auburn Ravine to<br />

Luther Road, including realignment, bike lanes, bus turnouts, and<br />

sidewalks. 20<strong>16</strong> $1,000,000<br />

Various improvements on Nevada Street from Highway 49 to I‐80,<br />

including widening 2 to 3 lanes, signalization, bike lanes, sidewalks,<br />

and bus turnouts. 20<strong>16</strong> $225,000<br />

Phase 2: Class I pedestrian/bikeway along Auburn Ravine paralleling<br />

Ferrari Ranch Road from Ingram Parkway west to Highway 65 and<br />

bridge crossing over Auburn Ravine. (Other State‐State Cash is<br />

Recreational Trails <strong>Program</strong> funding.) 2011 $1,849,109<br />

City of Lincoln Dept of<br />

Public Works<br />

PLA25208<br />

Auburn Ravine Phase 2<br />

Bike/Ped Bridge<br />

City of Roseville Dept of<br />

Public Works PLA25324 Fuel Station Cover Construct a Fuel Station Cover 2014 $0<br />

PLA<br />

Placer County Dept of<br />

Public Works PLA20880 Walerga Road Bridge<br />

Tahoe Truckee Jobs Access<br />

PLA Placer County Transit PCT10475 Reverse Commute <strong>Program</strong><br />

In Placer County, West of Roseville, Walerga Road at Dry Creek:<br />

widen bridge from 2 to 4 lanes. (Related to bridge rehab, PLA25506) 2015 $0<br />

In Placer County, Provide JARC operating assistance to Tahoe Area<br />

Regional Transit. Part of Sac RT Grant #CA‐37‐X065. 2011 $1,320,000<br />

SAC<br />

City of Folsom Dept of<br />

Public Works<br />

SAC24400<br />

Folsom Blvd. Bike/Ped<br />

Overcrossing<br />

In Folsom, at Folsom Blvd. and Humbug‐Willow Creek Parkway,<br />

construct a bicycle and pedestrian overcrossing of Folsom Blvd.<br />

Includes connections to existing trails on both sides of Folsom Blvd. 2014 $2,500,000<br />

SAC<br />

SAC<br />

Sacramento County Dept<br />

of <strong>Transportation</strong> SAC24267<br />

Arden Way ITS ‐ Watt Ave to<br />

Fair Oaks<br />

In Sacramento County: On Arden Way between Watt Avenue and<br />

Fair Oaks Blvd; This project will install ITS improvements on Arden<br />

Way from Watt Ave to Fair Oaks blvd. This improvement will<br />

continue the deployment of ITS strategies in the Arden Way<br />

corridor. As part of the Arden Way Intelligent <strong>Transportation</strong><br />

System, the proposed ITS elements will work to improve traffic<br />

management and mobility along Arden Way and provide a<br />

communication link between the County and other jurisdictions<br />

communication hubs. 2017 $3,500,000<br />

Sacramento County Dept<br />

of <strong>Transportation</strong> SAC24454 Bus Replacement Replace one commuter bus. 2012 $0<br />

<strong>2013</strong> MTIP - Page 353 of 390<br />

Deleted Projects: Page 26 of 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!