19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sacramento Area Council of Governments<br />

Appendix 4 Project List<br />

SACOG ID ELD19355 ELD Lead Agency El Dorado County Dept of <strong>Transportation</strong><br />

Project TItle<br />

EA Number:n/a<br />

Last Revised<br />

VAR79008 -<br />

Oak Hill Rd/Squaw Hollow Creek Bridge Replacement<br />

Completion Year<br />

13-00 2018<br />

Grouped Listing Title:<br />

Grouped Projects for Bridge Rehabilitation and<br />

Reconstruction - HBP <strong>Program</strong><br />

Project Description<br />

Oak Hill Rd over Squaw Hollow Creek, 0.6 miles south of<br />

Pleasant Valley Rd: Replace existing 2 lane bridge with<br />

new 2 lane bridge. Toll credits for PE, ROW, & CON.<br />

(CIP77134)<br />

Fed FY Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>16</strong><br />

Highway Bridge <strong>Program</strong><br />

$0<br />

$0<br />

$656,250 $656,250<br />

$202,000 $202,000<br />

$3,018,750 $3,018,750<br />

$3,877,000<br />

$3,877,000<br />

Bridge Number: 25C0096<br />

Federal Project<br />

Total Cost $3,877,000<br />

Exempt<br />

Category:<br />

Widening narrow pavements or reconstructing bridges (no additional travel lanes)<br />

SACOG ID ELD19320 ELD Lead Agency El Dorado County Dept of <strong>Transportation</strong><br />

Project TItle<br />

EA Number:n/a<br />

Last Revised<br />

VAR79008 -<br />

Rubicon Trail/Ellis Creek Bridge Replacement<br />

Completion Year<br />

13-00 2017<br />

Grouped Listing Title:<br />

Grouped Projects for Bridge Rehabilitation and<br />

Reconstruction - HBP <strong>Program</strong><br />

Project Description<br />

Rubicon Trail over Ellis Creek, 0.3 miles north of Loon<br />

Lake: Construct new 2 lane bridge over existing 2 lane<br />

Low Water Crossing, realign Rubicon Trail at bridge<br />

approaches, erosion control along the trail, and<br />

restoration work at the low water crossing. Toll Credits for<br />

ROW & CON. (CIP77117)<br />

Fed FY Revenue Source Engineering Right of Way Construction Total Revenue<br />

<strong>16</strong><br />

$0<br />

$0<br />

$375,000 $375,000<br />

$648,200 $648,200<br />

$1,023,200<br />

$1,023,200<br />

Bridge Number: 00L0037<br />

Federal Project<br />

Total Cost $1,023,200<br />

Exempt<br />

Category:<br />

Widening narrow pavements or reconstructing bridges (no additional travel lanes)<br />

<strong>2013</strong> MTIP - Page 173 of 390<br />

Page 53 of 207<br />

Tuesday, September 25, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!