Completed Projects from the 2011/14 MTIP<br />

Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

City of Rocklin Division of<br />

Engineering PLA25357 Safe School Route Phase 5<br />

City of Rocklin Division of<br />

Stanford Ranch Rd. Pavement<br />

Engineering<br />

PLA25503 Rehabilitation<br />

In downtown Rocklin: Construct new sidewalks and bicycle lanes on<br />

remaining unimproved existing streets, allowing access to<br />

Springview School, downtown, and adjacent residential<br />

neighborhoods. (Emission Benefits in kg/day: ROG 0.26, NOx 0.15,<br />

PM10 0.03) 2011 $2,897,856<br />

Reconstruct Stanford Ranch Rd. from Sunset Blvd. to Roseville City<br />

Limits. 2012 $2,014,844<br />

In Roseville, add micropave resurfacing to sections of Church St.,<br />

City of Roseville Dept of<br />

Public Works PLA25443<br />

Baseline Rd., Junction Blvd., Foothills Blvd., Atlantic St. & Pleasant<br />

2010 Arterial Micropave Project Grove Blvd. 2011 $1,337,225<br />

City of Roseville Dept of<br />

Public Works<br />

PLA25406<br />

Baseline Rd & Foothills Blvd<br />

CMS Installation Project<br />

In Roseville, install Changeable Message Signs (CMS) on S/B Foothills<br />

Blvd. south of Vineyard Road and E/B Baseline Road east of<br />

Fiddyment Road to reduce traffic congestion by improving traffic<br />

information dissemination per the ITS Master Plan. (Qualitative<br />

Emission Benefit Analysis on file.) 2012 $300,000<br />

PLA<br />

PLA<br />

City of Roseville Dept of<br />

Public Works PLA25375 Blue Oaks Extension<br />

City of Roseville Dept of<br />

Public Works PLA25415 Bus Purchase<br />

Roseville, Blue Oaks from 1300' west of Fiddyment to Hayden Pkwy.,<br />

extend as 2 lanes, including a 3 lane bridge over Kaseberg Creek. 2012 $3,200,000<br />

Replace three (3) DAR style buses with 3 low floor buses @ $130,000<br />

each. (FTA funds apportioned in FFY 2009.) 2012 $390,000<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

City of Roseville Dept of<br />

Public Works PLA25361 Call Center<br />

One‐stop Call Center for all of South Placer County for human<br />

service/demand responsive transit. FFY 2006 5317 funds used. 2012 $250,000<br />

Roseville, Harding Blvd @ Dry Creek, I‐80 to Royer Park: Construct<br />

class 1 bikeway in 2 phases. Phase 1 from I‐80 to Harding Blvd<br />

completed in 2004 (PLA20870) completed in 2004. Phase 2<br />

construction is separated into 3 segments: Segment 2 is located<br />

City of Roseville Dept of<br />

I‐80 To Royer Park Bikeway from East Street to Folsom Road. (Emission benefits in kg/day: 0.25<br />

Public Works<br />

PLA25385 Phase 2 ‐ Segment 2<br />

ROG, 0.2 NOx 0.09 PM10) 2012 $413,592<br />

In Roseville, apply 2‐inch gap graded rubberized Asphalt to Industrial<br />

City of Roseville Dept of<br />

Industrial Ave. Rubberized Ave. from Washington Blvd. to Justice Center Dr. (Toll Credits for<br />

Public Works<br />

PLA25429 Overlay<br />

CON) 2012 $2,491,590<br />

City of Roseville Dept of<br />

Pleasant Grove Blvd: Extend 4 lanes from Fiddyment Rd to 1500 feet<br />

Public Works PLA25379 Pleasant Grove Blvd<br />

west of Market Street. 2007 $4,400,000<br />

City of Roseville Dept of<br />

Public Works PLA25404 Repower/Rehab Buses Repower/Rehab buses 2012 $1,215,000<br />

In Roseville, install fiber optic Conduit, cable & pull‐boxes along<br />

Cirby Wy, Rocky Ridge Dr, Old Auburn Rd, S Cirby wy, Rsvl Pkwy,<br />

Blue Oaks Blvd, Fiddyment Rd, Baseline Rd, Woodcreek Oaks Blvd,<br />

City of Roseville Dept of<br />

Junction Blvd & Foothills Blvd. Emission reduction benefits (kg/day):<br />

Public Works PLA25288 Roseville Fiber Optics Project ROG 0.32, NOx 0.32 2012 $964,319<br />

<strong>2013</strong> MTIP - Page 331 of 390<br />

Completed Projects: Page 4 of 27