19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Completed Projects from the 2011/14 MTIP<br />

Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

PLA Caltrans District 3 CAL20398 I‐80 Rehabilitation<br />

PLA Caltrans District 3 CAL20375 Northstar Slope Stabilization<br />

In Placer County, in Auburn, from .05 mile west of Ophir Road UC to<br />

0.1 mile east of Russell Road OC ‐ Rehabilitate roadway [<strong>16</strong>.8/R18.9]<br />

(SHOPP) 2012 $6,491,000<br />

Near Truckee, from 1.2 miles east of Northstar Drive to Brockway<br />

Summit ‐ Stabilize slopes, repair dikes and culverts, and place rock<br />

slope protection (PM 4.9/6.7). (Storm Water Mitigation) 2012 $7,153,000<br />

PLA Caltrans District 3 CAL17240<br />

Route 65 Lincoln Bypass Phase<br />

1<br />

PLA Caltrans Division of Rail CAL18768 Dinky Way Grade Crossing<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

PLA<br />

City of Auburn Dept. of<br />

Public Works<br />

City of Auburn Dept. of<br />

Public Works<br />

PLA25246<br />

PLA25399<br />

City of Auburn Dept. of<br />

Public Works PLA25441 Road Rehab<br />

City of Auburn Dept. of<br />

Public Works PLA25351 Street Sweeper Replacement<br />

City of Lincoln Dept of<br />

Ferrari Ranch Rd. at SR 65<br />

Public Works<br />

PLA19070 Bypass<br />

City of Lincoln Dept of<br />

Public Works<br />

PLA25311<br />

Placer County, State Route 65: Construct Lincoln Bypass Phase 1: a 4‐<br />

lane expressway on a new alignment from Industrial Avenue to<br />

north of North Ingram Slough and continue north with 2 lanes to<br />

Sheridan. Also design and construct a Park and Ride facility at SR 65<br />

Bypass and Industrial Avenue. (Emission Reductions in kg/day: ROG<br />

1, NOx 1.2, PM10 0.6.) (PM R12.2/R23.8). [CTIPS ID 107‐0000‐0074;<br />

EFIS ID 0300000408] (Phase 2A is CAL20460) 2012 $290,852,000<br />

In the City of Colfax, at the intersection of Dinky Way and UPRR:<br />

Eliminate hazards at railroad grade crossing. (USDOT RR Xing #<br />

753152B) 2011 $550,000<br />

Purchase of one minibus and bus accessories for Auburn Transit.<br />

Minibus may be alternative fueled (e.g. CNG or electric‐hybrid). This<br />

bus will replace a cutaway minibus (gasoline). (FTA 5309 funds were<br />

apportioned in FFY 2004) 2011 $121,360<br />

Auburn Transit ‐ Bus<br />

Replacement<br />

Auburn Transit Bus<br />

Replacement Purchase 2 (two) 25' replacement buses. 2011 $<strong>16</strong>6,500<br />

In Auburn, Palm Ave from Hwy 49 to Auburn Ravine, Marguerite<br />

Mine from Auburn Ravine to City Limits, and Dairy Road from<br />

Auburn Ravine to Luther Road: perform pavement resurfacing<br />

and/or rehabilitation. 2012 $363,768<br />

NEV <strong>Transportation</strong> Project ‐<br />

Phase 2<br />

Replace one existing 1992 Ford Tymco 600 sweeper, with a new<br />

diesel powered street sweeper. (Emissions Reductions in kg/day:<br />

NOx 0.08, PM10 0.<strong>16</strong>) 2011 $282,040<br />

In Lincoln, SR 65 Lincoln Bypass at Ferrari Ranch Road: construct<br />

interchange. 2012 $14,495,628<br />

In Lincoln: Various streets within Lincoln; striping, pavement<br />

markings, and signage on various roadways for NEV <strong>Transportation</strong><br />

Project. 2012 $273,430<br />

PLA<br />

City of Rocklin Division of<br />

Engineering<br />

PLA25502<br />

Rocklin Rd/Meyers St.<br />

Roundabout<br />

Construct a new roundabout at the intersection of Rocklin Road and<br />

Meyers Street (Emission Benefits in kg/day: 1 ROG, 1 NOx, 1 CO) 2012 $1,852,592<br />

<strong>2013</strong> MTIP - Page 330 of 390<br />

Completed Projects: Page 3 of 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!