Completed Projects from the 2011/14 MTIP<br />
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
YOL Caltrans District 3 CAL20440 Rest Area Sewer Ponds<br />
YOL Caltrans District 3 CAL20444 Sut‐113 Roadway Rehab<br />
US 50 / Harbor Boulevard<br />
YOL Caltrans District 3 YOL15880 Interchange<br />
YOL Caltrans District 3 CAL18834 Yol‐5 Deck Rehab<br />
YOL Caltrans District 3 CAL204<strong>16</strong> Yol‐5 Pavement Rehab<br />
YOL Caltrans District 3 CAL20395<br />
YOL Caltrans Division of Rail CAL20464<br />
Yolo 80 Median Widening Near<br />
Davis<br />
CR 105/32A / UPRR Grade<br />
Crossing Safety<br />
YOL Caltrans Division of Rail CAL20381 Yolo Causeway Crossover<br />
Near Dunnigan at 1.0 mile south of Dunnigan Rest Area ‐ Plastic<br />
lining in sewer ponds [Yol‐5‐24.6]. 2011 $850,000<br />
Near Knights Landing, from Yolo County line to Sutter Causeway<br />
Bridge #18‐32 ‐ Roadway rehabilitation (PM 0.0/10.8) [CTIPS ID 107‐<br />
0000‐0847]. 2012 $12,884,000<br />
In West Sacramento, US 50, Harbor Blvd Interchange: widen to 6<br />
lanes, revise ramps and add auxiliary lanes. HPP #3791 2011 $37,887,000<br />
Yolo County, near Woodland, at Yolo Bypass Bridge #22‐0124R/L ‐<br />
Rehabilitate bridge deck (PM 0.8/2.5). (Toll credits) 2012 $7,242,000<br />
In Yolo County 8 miles north of Woodland from County Road 96 OC<br />
to Oat Creek Bridge ‐ AC overlay (CAPM) (PM R14.0/R21.8) [SHOPP<br />
Roadway Preservation ‐ Pavement Rehab] 2011 $9,408,000<br />
In and near Davis, from Richards Boulevard to 0.1 mile west of Yolo<br />
Causeway West Bridge 2244 ‐ Widen shoulder and install rumble<br />
strip (PM 0.2/5.7) [SHOPP Collision Reduction Lump Sum project]. 2012 $7,732,000<br />
In unincorporated Yolo County, at intersection of County Rd 105/32A<br />
and UPRR: eliminate hazards at railroad grade crossing. USDOT RR<br />
Xing No 751224V. 2012 $205,563<br />
Yolo County, west of existing Yolo Causeway, parallel to I‐80 on<br />
UPRR right of way, between mile post 75.35 and 90.06: construct<br />
universal crossover to allow trains to switch tracks. 2011 $5,150,000<br />
YOL<br />
YOL<br />
City of West Sacramento<br />
Dept of Public Works YOL19273 CEMEX Rail Safety<br />
City of West Sacramento<br />
Dept of Public Works YOL19267 Road Rehab Stimulus<br />
Within the existing right of way, within the Port of Sacramento,<br />
reduce the number of train movements across two at‐grade rail<br />
crossings by constructing a rail line from the Port of Sacramento to<br />
the CEMEX concrete cement import facility." (Emission Benefits in<br />
kg/day: Emission Benefits in Kg/day: (0.1 VOC, 0.9 CO, 0.1 NOx) 2012 $1,400,000<br />
Sacramento Avenue, Jefferson Boulevard, F Street and various<br />
location: Rehabilitate with overlays and slurry seal. 2011 $3,230,000<br />
YOL<br />
City of West Sacramento<br />
Dept of Public Works<br />
YOL<strong>16</strong>491<br />
Tower Bridge Gateway<br />
Modification (East Phase)<br />
In West Sacramento, Tower Bridge Gateway (former State Route<br />
275) from Tower Bridge to the UPRR underpass: reconfigure road<br />
from a controlled access expressway to an arterial roadway with<br />
signalized at‐grade intersections at 3rd and 5th Streets. (Emission<br />
Benefits in kg/day: 0.<strong>16</strong> ROG, 0.09 NOx) 2012 $13,889,000<br />
<strong>2013</strong> MTIP - Page 346 of 390<br />
Completed Projects: Page 19 of 27