19.06.2014 Views

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

2013/16 Metropolitan Transportation Improvement Program ... - sacog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Completed Projects from the 2011/14 MTIP<br />

Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />

County Lead Agency Project ID Title Description Completion Year Total Cost<br />

YOL Caltrans District 3 CAL20440 Rest Area Sewer Ponds<br />

YOL Caltrans District 3 CAL20444 Sut‐113 Roadway Rehab<br />

US 50 / Harbor Boulevard<br />

YOL Caltrans District 3 YOL15880 Interchange<br />

YOL Caltrans District 3 CAL18834 Yol‐5 Deck Rehab<br />

YOL Caltrans District 3 CAL204<strong>16</strong> Yol‐5 Pavement Rehab<br />

YOL Caltrans District 3 CAL20395<br />

YOL Caltrans Division of Rail CAL20464<br />

Yolo 80 Median Widening Near<br />

Davis<br />

CR 105/32A / UPRR Grade<br />

Crossing Safety<br />

YOL Caltrans Division of Rail CAL20381 Yolo Causeway Crossover<br />

Near Dunnigan at 1.0 mile south of Dunnigan Rest Area ‐ Plastic<br />

lining in sewer ponds [Yol‐5‐24.6]. 2011 $850,000<br />

Near Knights Landing, from Yolo County line to Sutter Causeway<br />

Bridge #18‐32 ‐ Roadway rehabilitation (PM 0.0/10.8) [CTIPS ID 107‐<br />

0000‐0847]. 2012 $12,884,000<br />

In West Sacramento, US 50, Harbor Blvd Interchange: widen to 6<br />

lanes, revise ramps and add auxiliary lanes. HPP #3791 2011 $37,887,000<br />

Yolo County, near Woodland, at Yolo Bypass Bridge #22‐0124R/L ‐<br />

Rehabilitate bridge deck (PM 0.8/2.5). (Toll credits) 2012 $7,242,000<br />

In Yolo County 8 miles north of Woodland from County Road 96 OC<br />

to Oat Creek Bridge ‐ AC overlay (CAPM) (PM R14.0/R21.8) [SHOPP<br />

Roadway Preservation ‐ Pavement Rehab] 2011 $9,408,000<br />

In and near Davis, from Richards Boulevard to 0.1 mile west of Yolo<br />

Causeway West Bridge 2244 ‐ Widen shoulder and install rumble<br />

strip (PM 0.2/5.7) [SHOPP Collision Reduction Lump Sum project]. 2012 $7,732,000<br />

In unincorporated Yolo County, at intersection of County Rd 105/32A<br />

and UPRR: eliminate hazards at railroad grade crossing. USDOT RR<br />

Xing No 751224V. 2012 $205,563<br />

Yolo County, west of existing Yolo Causeway, parallel to I‐80 on<br />

UPRR right of way, between mile post 75.35 and 90.06: construct<br />

universal crossover to allow trains to switch tracks. 2011 $5,150,000<br />

YOL<br />

YOL<br />

City of West Sacramento<br />

Dept of Public Works YOL19273 CEMEX Rail Safety<br />

City of West Sacramento<br />

Dept of Public Works YOL19267 Road Rehab Stimulus<br />

Within the existing right of way, within the Port of Sacramento,<br />

reduce the number of train movements across two at‐grade rail<br />

crossings by constructing a rail line from the Port of Sacramento to<br />

the CEMEX concrete cement import facility." (Emission Benefits in<br />

kg/day: Emission Benefits in Kg/day: (0.1 VOC, 0.9 CO, 0.1 NOx) 2012 $1,400,000<br />

Sacramento Avenue, Jefferson Boulevard, F Street and various<br />

location: Rehabilitate with overlays and slurry seal. 2011 $3,230,000<br />

YOL<br />

City of West Sacramento<br />

Dept of Public Works<br />

YOL<strong>16</strong>491<br />

Tower Bridge Gateway<br />

Modification (East Phase)<br />

In West Sacramento, Tower Bridge Gateway (former State Route<br />

275) from Tower Bridge to the UPRR underpass: reconfigure road<br />

from a controlled access expressway to an arterial roadway with<br />

signalized at‐grade intersections at 3rd and 5th Streets. (Emission<br />

Benefits in kg/day: 0.<strong>16</strong> ROG, 0.09 NOx) 2012 $13,889,000<br />

<strong>2013</strong> MTIP - Page 346 of 390<br />

Completed Projects: Page 19 of 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!