2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Completed Projects from the 2011/14 MTIP<br />
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
SUT Caltrans Division of Rail CAL20463<br />
Rednall Rd / UPRR Grade<br />
Crossing Safety<br />
SUT City of Live Oak SUT18825 New Traffic Signals<br />
In unincorporated Sutter County, at Rednall Rd and UPRR: eliminate<br />
hazards at railroad grade crossing. USDOT RR Xing No 753289V 2012 $564,153<br />
In Live Oak, at Live Oak Blvd and Elm St: Install new traffic signals<br />
with interconnects to Union Pacific RR Crossing and existing signal at<br />
next intersection. 2012 $1,552,183<br />
SUT<br />
SUT<br />
SUT<br />
SUT<br />
SUT<br />
SUT<br />
SUT<br />
SUT<br />
City of Yuba City Dept of<br />
Public Works SUT10831 Defining the Urban‐Rural Edge<br />
City of Yuba City Dept of<br />
Public Works<br />
City of Yuba City Dept of<br />
Public Works<br />
Sutter County Dept of<br />
Public Works<br />
Sutter County Dept of<br />
Public Works<br />
Sutter County Dept of<br />
Public Works<br />
SUT18840<br />
SUT18852<br />
SUT18831<br />
SUT18861<br />
SUT18849<br />
The City will utilize these funds to define the urban‐rural edge along<br />
the northern, western, and southern boundaries of the City. This<br />
edge will consist of improving Pease, Township, and Bogue Roads for<br />
the General Plan purpose of creating a transition from the edge of<br />
planned urban development to the adjoining open space and<br />
agricultural lands in Sutter County. 2011 $334,410<br />
SR 20 Corridor, east of SR 99 in and around Yuba City: Conduct<br />
walking tour(s) and associated outreach efforts with the goal of<br />
promoting Blueprint principles. 2012 $111,500<br />
Highway 20 Revitalization<br />
Strategy<br />
Western Parkway / SR‐20<br />
Intersection Construct the new intersection of Western Parkway and SR‐20 2011 $3,700,000<br />
Butte House Rd. Shoulder Butte House Rd., between Humphrey Rd. and a point 3,500 feet east<br />
Widening<br />
of Butte house Rd.: Widen shoulders. 2011 $882,200<br />
Install pedestrian crosswalk lighting at an existing crosswalk on<br />
Lincoln Road near Lincrest Elementary School with a concrete<br />
Phillips Rd. Bike/Ped<br />
median, speed display signs, flashing yellow beacons and class II bike<br />
<strong>Improvement</strong><br />
lanes. 2012 $112,957<br />
Pleasant Grove Rd Bridge<br />
Replacement<br />
Sutter County Dept of<br />
Public Works SUT18842 Road Rehabilitation<br />
Sutter County Dept of<br />
Public Works SUT18843 Road Rehabilitation<br />
Pleasant Grove Rd, over Curry Creek, 2.9 miles nor of Riego Rd and<br />
4.2 miles north of Sacramento County line: Replace 2 ea, 2 lane<br />
bridges with new 2 lane bridge and a culvert. 2010 $1,606,000<br />
In unincorporated Sutter County, rehabilitate the following<br />
roadways: Tierra Buena Rd from Butte House Rd to Pease Rd,<br />
Pleasant Grove Rd from Cornelius Ave to Marcum Rd. 2012 $993,133<br />
In unincorporated Sutter County, on various roads: rehabilitate<br />
roadways. 2012 $1,488,198<br />
VAR Caltrans District 3 CAL20394 ED/Pla/But Guardrail<br />
In El Dorado, Placer, and Butte Counties at various locations ‐ Install<br />
metal beam guardrail (MBGR) and end treatments (Safety CT Minor<br />
project) [Locations: ED‐49‐35.12/35.23 (Near Cool, 0.7 mi N of SR<br />
193); ED‐50‐53.51/53.89 (Near Kyburz just W of Wrights Lake Rd);<br />
Pla‐193‐7.96/8.00 (2 mi W of I‐80 near Summer Star Lane); But‐191‐<br />
8.19/8.26 (S of Paradise, 0.5 mi S of Airport Rd). 2010 $1,026,000<br />
<strong>2013</strong> MTIP - Page 342 of 390<br />
Completed Projects: Page 15 of 27