2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Completed Projects from the 2011/14 MTIP<br />
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
VAR SACOG VAR56008<br />
<strong>Program</strong>ming and Monitoring<br />
(RSTP) Phase 1<br />
VAR SACOG VAR56032 Regional Bicycle Trip Planner<br />
VAR SACOG VAR56030<br />
Regional Transit Mobility<br />
Training<br />
Perform state and federal programming and monitoring activities,<br />
including revisions to the MTIP and STIP, ensuring timely delivery of<br />
projects using state and federal funds, coordination with FHWA, FTA,<br />
Caltrans, CTC, transit operators, and local project sponsors. Ongoing.<br />
(<strong>Program</strong>ming and Monitoring work is eligible for RSTP per 23 CFR,<br />
Part 450, section 133.) (Phase 2, VAR56101) 2012 $1,495,621<br />
Develop and launch a fully‐functional web‐based Bicycle Trip<br />
Planner. 2011 $285,564<br />
Regional Transit Mobility Training: Encourage and train new riders to<br />
use public transportation. (Emissions Benefits in kg/day: 0.1 ROG,<br />
0.1 NOx) 2011 $82,000<br />
VAR SACOG VAR56088<br />
VAR SACOG VAR56041<br />
SACOG After 9PM Alternative<br />
Transit/<strong>Transportation</strong> Study<br />
SACOG Region Safe Routes to<br />
School<br />
This Study conducted by SACOG to describe viable transportation<br />
options for those transit dependent person who need to travel after<br />
9 PM for employment, training and educational purposes. The study<br />
builds on the recently completed SACOG Lifeline <strong>Transportation</strong><br />
Study and will use recently released Census 2010 data. 2012 $43,750<br />
For all schools in El Dorado, Placer, Sacramento, Sutter, Yolo, and<br />
Yuba Counties: Create tools, programs, and materials that promote<br />
safe walking and bicycling; conduct outreach and educate partners.<br />
(SRTS# S0203019) 2012 $240,000<br />
Develop and install an information exchange system‐‐the<br />
Sacramento <strong>Transportation</strong> Area Network, or STARNET‐‐and connect<br />
18 traffic and emergency centers. (Emission Benefits in kg/day: 223<br />
ROG, 223 NOx, 330 CO) 2011 $5,345,419<br />
VAR SACOG VAR11000 STARNET Integration<br />
Operating Assistance for FY<br />
VAR Yuba Sutter Transit YST10432 2012 Yuba‐Sutter Transit Operating Assistance for FY 2012 2012 $5,715,200<br />
Operating Assistance for Yuba‐<br />
VAR Yuba Sutter Transit YST10433 Sutter Transit 2011 Yuba‐Sutter Transit Operating Assistance for 2011 2011 $5,626,000<br />
In Yolo County, near Winters, from 0.7 mile north of Yolo Co Line to<br />
Route 5/505 separation ‐ Rehabilitate roadway [PM 0.7/R22.4]<br />
YOL Caltrans District 3 CAL20397 Hwy 505 Rehabilitation (SHOPP) 2011 $14,925,000<br />
YOL Caltrans District 3 CAL18789 I‐5 Tree Planting<br />
Tree Planting in Yolo County on I‐5, from Woodland to the Colusa<br />
County Line. 2012 $710,000<br />
YOL Caltrans District 3 CAL20421 I‐80 Maintenance in Davis<br />
In and near Davis from Solano Co Line to 1.4 miles west of Yolo<br />
Causeway: perform maintenance of asphalt and concrete overlay. 2012 $4,219,000<br />
YOL Caltrans District 3 YOL19257<br />
New Traffic Signals & Modify<br />
Intersection<br />
In Yolo County, intersection of SR<strong>16</strong> at Kentucky Ave (County Road<br />
20): Install new traffic signals and modify intersection. (HSIP #5463) 2010 $3,804,000<br />
<strong>2013</strong> MTIP - Page 345 of 390<br />
Completed Projects: Page 18 of 27