2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
2013/16 Metropolitan Transportation Improvement Program ... - sacog
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Completed Projects from the 2011/14 MTIP<br />
Appendix 5 ‐ Completed, Delayed, and Deleted Projects<br />
County Lead Agency Project ID Title Description Completion Year Total Cost<br />
ELD Caltrans District 3 CAL20410<br />
Bullion Bend/Ice House<br />
Roadway Rehab<br />
ELD Caltrans District 3 CAL18741 ED‐49 Log Town Safety<br />
Placerville U.S. 50 Culvert<br />
ELD Caltrans District 3 CAL18773 Rehab<br />
In El Dorado County, Bullion Bend/Ice House Rd, from 0.1 mile west<br />
of Sawmill Road undercrossing in Pollock Pines to the South Fork<br />
American River Bridge ‐ Rehabilitate roadway (PM 28.8/39.6) 2012 $15,021,600<br />
Near El Dorado ‐ From Ore Court Road to China Hill Road ‐ Widen<br />
shoulders. 2010 $13,012,760<br />
East of Placerville, at various locations along Route 50 ‐ Rehabilitate<br />
culverts (SHOPP). 2011 $3,807,000<br />
ELD Caltrans District 3 CAL20392 US 50 Highway Maintenance From Ice House Road to Strawberry: Perform highway maintenance. 2011 $8,427,000<br />
ELD Caltrans District 3 CAL18786 US 50 Wildlife Crossing<br />
In El Dorado County, US 50: Construct Wildlife Crossing near Shingle<br />
Springs, from 1.1 miles east of Greenstone Road UC to 0.3 mile west<br />
of El Dorado Road OC (PM 13.3/13.7) [CTIPS ID 107‐0000‐0660] [EFIS<br />
ID 0300000317] 2012 $1,626,000<br />
ELD<br />
ELD<br />
ELD<br />
City of Placerville Dept of<br />
Public Works<br />
ELD19299<br />
ARRA Road Rehab ‐ Hocking &<br />
Morrene<br />
Rehabilitate Hocking Street from Mosquito Road to Morrene Drive,<br />
and Morrene Drive from Hocking Street to Giovanni Drive 2011 $256,180<br />
City of Placerville Dept of<br />
In the City of Placerville, Point View Drive from Broadway to Smith<br />
Public Works ELD19100 Point View Drive<br />
Flat Road: extend two‐lane road. 2011 $3,<strong>16</strong>0,000<br />
El Dorado County Dept of<br />
Durock Rd/Business Center Dr ‐<br />
<strong>Transportation</strong> ELD19230 Signal Signalize intersection and add turn pockets on Durock Rd. (CIP73354) 2011 $2,268,700<br />
ELD<br />
ELD<br />
ELD<br />
El Dorado County Dept of<br />
<strong>Transportation</strong><br />
El Dorado County Dept of<br />
<strong>Transportation</strong><br />
El Dorado County Dept of<br />
<strong>Transportation</strong><br />
ELD<strong>16</strong>140<br />
ELD19323<br />
ELD19296<br />
Green Valley Rd/N. Shingle Rd ‐<br />
Realignment<br />
Green Valley Rd/Tennessee<br />
Creek Bridge Replacement<br />
North Shingle Rd and Newtown<br />
Rd ‐ Road Rehab<br />
Realign curve on east leg, add 8‐ft shoulders, add left and right turn<br />
lanes, and signalize intersection; project in conjunction with<br />
Tennessee Creek Bridge Replacement (CIP77109/ELD19323). 2012 $1,528,142<br />
Replace functionally obsolete 2 lane bridge with new 2 lane bridge<br />
over Tennessee Creek, 0.2 miles north of North Shingle Rd.<br />
(CIP77109) 2012 $5,363,000<br />
Asphalt concrete overlays on North Shingle Rd (4.0 miles) from<br />
US50/Ponderosa Rd to Green Valley Rd (CIP72179); and on Newtown<br />
Rd (5.0 miles) from Mining Brook Rd to Pleasant Valley Rd<br />
(CIP72184). 2011 $2,729,648<br />
ELD<br />
El Dorado County Dept of<br />
<strong>Transportation</strong><br />
ELD19292<br />
Silva Valley Pkwy Widening<br />
from Entrada<br />
Widen Silva Valley Pkwy (2 to 4 lanes) from Entrada Dr to 1000 feet<br />
south of Oak Meadow Elem School; includes sidewalk, bike lanes and<br />
left‐turn storage for school entrance. CIP72370 2011 $1,221,439<br />
<strong>2013</strong> MTIP - Page 328 of 390<br />
Completed Projects: Page 1 of 27