06.11.2014 Views

Pierce Annex

Pierce Annex

Pierce Annex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Report #UCR P5508 <strong>Pierce</strong> <strong>Annex</strong><br />

Report<br />

Name<br />

Item/Location<br />

Barrier<br />

(noted feature, item or area does not meet the<br />

new construction criteria detailed below)<br />

Action Priority Target<br />

Date<br />

Estimated<br />

Cost<br />

Interim<br />

Solution<br />

Action<br />

Completion<br />

Date<br />

UCR P5508<br />

<strong>Pierce</strong><br />

<strong>Annex</strong><br />

UCR P5508<br />

<strong>Pierce</strong><br />

<strong>Annex</strong><br />

UCR P5508<br />

<strong>Pierce</strong><br />

<strong>Annex</strong><br />

161-Clear Space at<br />

Doors: Rooms #222 and<br />

#219 on the 2nd Floor at<br />

<strong>Pierce</strong> <strong>Annex</strong>.<br />

162-Signage: Rooms<br />

#222 and #219 on the<br />

2nd Floor at <strong>Pierce</strong><br />

<strong>Annex</strong>.<br />

164-Sinks: Rooms #222<br />

and #219 on the 2nd<br />

Floor at <strong>Pierce</strong> <strong>Annex</strong>.<br />

Minimum strike side clearance on PUSH side of<br />

door: 12" front approach with latch and closer.<br />

Mounting height is 60" from the finish floor to the<br />

centerline of the sign.<br />

Minimum 30" x 48" clear space is provided in<br />

front of sink that allows forward approach. Sink<br />

is a maximum of 6-1/2" deep. Knee clearance<br />

under sink is a minimum of 27" high and 30"<br />

wide, and provides an absolute depth of 19"<br />

underneath the sink [ADAAG 606.2 Exception 6<br />

The dip of the overflow shall not be considered<br />

in determining knee and toe clearance]. Drain<br />

and hot water piping is insulated or configured to<br />

prevent contact.<br />

Relocate furniture to provide<br />

clear space. University staff shall<br />

be instructed to place and<br />

maintain the placement of<br />

furniture to provide a clear path<br />

of travel and avoid the<br />

obstruction of accessible<br />

required clear spaces.<br />

1M $122.51<br />

Relocate existing signage. 3 $490.00<br />

Replace with accessible sink.<br />

Insulate pipes under sink. Cut<br />

the paneling under the sink<br />

counter to comply with knee<br />

clearance.<br />

3 $7,840.16<br />

UCR P5508<br />

<strong>Pierce</strong><br />

<strong>Annex</strong><br />

166-Controls, Operating<br />

Mechanisms & Vending<br />

Machines.: Rooms #222<br />

and #219 on the 2nd<br />

Floor at <strong>Pierce</strong> <strong>Annex</strong>.<br />

[Various machines.]<br />

Forward Reach to Objects: Highest operable<br />

part of object is a maximum of 48" above the<br />

floor surface.<br />

Relocate existing paper towel<br />

dispenser. Lower the machine.<br />

3 $183.75<br />

6/1/2012 Page 20 of 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!