University of California at Riverside<br />

Site Evaluation Survey<br />

Report: UCR P5508 <strong>Pierce</strong> <strong>Annex</strong> in Riverside, CA<br />

900 University Avenue Qty Unit<br />

Sub<br />

Contractor<br />

Sub<br />

Total<br />

(10%)<br />

Concealed<br />

Conditions<br />

(12.5%)<br />

Security<br />

Conditions<br />

(15%)<br />

General<br />

Conditions<br />

Total<br />

56. Signage - Door to Courtyard from Room #111 on the 1st Floor of <strong>Pierce</strong> <strong>Annex</strong>.<br />

Priority: 2<br />

RECOMMENDATIONS AND RETROFIT COSTS:<br />

Install permanent ID sign to latch side of door. 1 ea. $129.12 $129.12 $142.03 $159.78 $183.75 $183.75<br />

TOTAL EST: $183.75<br />

57. Elevators - Southeast Side at <strong>Pierce</strong> <strong>Annex</strong>.<br />

Priority: 1<br />

RECOMMENDATIONS AND RETROFIT COSTS:<br />

Requires engineering/architectural evaluation. 1 ea. $5,000.00 $5,000.00 $5,500.00 $6,187.50 $7,115.62 $7,115.62<br />

Repair door operation. 1 ea. $1,500.00 $1,500.00 $1,650.00 $1,856.25 $2,134.69 $2,134.69<br />

Provide a raised five pointed star at the ground level. 1 ea. $250.00 $250.00 $275.00 $309.38 $355.79 $355.79<br />

TOTAL EST: $9,606.10<br />

60. Doors - Southeast Entrance on the 1st Floor to <strong>Pierce</strong> <strong>Annex</strong>.<br />

Priority: 2<br />

RECOMMENDATIONS AND RETROFIT COSTS:<br />

Replace door(s) and frame (stud wall). 1 ea. $2,203.65 $2,203.65 $2,424.02 $2,727.02 $3,136.07 $3,136.07<br />

Adjust door for opening pressure/closing times unless accepted 1 ea. $215.20 $215.20 $236.72 $266.31 $306.26 $306.26<br />

by DSA / Fire Life Safety.<br />

Post a sign/decal displaying the ”International Symbol of Accessibility”<br />

1 ea. $17.22 $17.22 $18.94 $21.31 $24.51 $24.51<br />

at the primary entrance.<br />

TOTAL EST: $3,466.84<br />

62. Stairways - Southeast Entrance on the 1st Floor to <strong>Pierce</strong> <strong>Annex</strong>.<br />

Priority: 2<br />

RECOMMENDATIONS AND RETROFIT COSTS:<br />

Remove/Replace existing stairways or steps. 30 riser $705.86 $21,175.80 $23,293.38 $26,205.05 $30,135.81 $30,135.81<br />

TOTAL EST: $30,135.81<br />

63. Stairway Handrails - Southeast Entrance on the 1st Floor to <strong>Pierce</strong> <strong>Annex</strong>.<br />

Priority: 2<br />

RECOMMENDATIONS AND RETROFIT COSTS:<br />

Raise/Lower existing handrail height. 130 l.f. $88.00 $11,440.00 $12,584.00 $14,157.00 $16,280.55 $16,280.55<br />

TOTAL EST: $16,280.55<br />

Page 8 of 33