GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-RD-09-0028<br />
page 154 of 204<br />
playback the priority RT data over coinciding CGSs as driven by the Image-<br />
Acquisition-Plan;<br />
use the remaining downlink capacity to playback the non RT data buffered on-board;<br />
systematically playback the NRT before the nominal data partitions at CGS downlink<br />
contact segments granted for the reception of NRT data;<br />
maximise the usage of the CGS downlink budget available to playback the on-board<br />
recorded data within spacecraft capabilities;<br />
systematically minimize the age of the MSI data at the time it is received on ground<br />
considering the above priorities.<br />
S2-<strong>PDGS</strong>-MPL-155<br />
The <strong>PDGS</strong>/MPL function shall be able to process the Mission-Plan response provided by<br />
the FOS to acknowledge the scheduling of the requested activities. In case of any<br />
discrepancy, the MPL function shall alert to the operator accordingly.<br />
S2-<strong>PDGS</strong>-MPL-160<br />
The <strong>PDGS</strong>/MPL function for the Mission-Plan generation activities shall make use of a<br />
simplified satellite operation model for data-handling configurable separately per<br />
spacecraft through the following parameters at minimum:<br />
the effective MSI data supply rate of each detector after WICOM compression<br />
the MSI detectors activated<br />
the MSI data handling granularity<br />
the sizes of the MMFU MSI packet store, the ancillary packet store and the HKTM<br />
packet store,<br />
the X-band and OCP effective downlink rates per each channel<br />
the S-band effective uplink rate (to estimate the uplink time) (TBC)<br />
S2-<strong>PDGS</strong>-MPL-165<br />
The <strong>PDGS</strong>/MPL function shall be able to generate the ground-stations (CGS & LGS)<br />
Acquisition-Schedule-Plan according to the acknowledged Mission-Plan.<br />
S2-<strong>PDGS</strong>-MPL-170<br />
The <strong>PDGS</strong>/MPL function shall be to notify in advance to every ground station the list of<br />
required downlink passes according to the Acquisition-Schedule-Plan.<br />
S2-<strong>PDGS</strong>-MPL-175<br />
The <strong>PDGS</strong>/MPL function shall be able to generate the EDRS Booking-Plan according to<br />
the acknowledged Mission-Plan.<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.