<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 46 of 204<br />

The mission operation and unavailability plans generated by the FOS and the EDRS<br />

exploitation segment<br />

All <strong>PDGS</strong> internal configuration data for mission planning, acquisition, processing,<br />

archiving, quality control, data-access, etc.<br />

S2-<strong>PDGS</strong>-SYS-250<br />

The <strong>PDGS</strong> shall be able to generate conflict-free mission plans covering the imageacquisition<br />

(for observation and calibration) and the downlink plans cascading from the<br />

systematic mission scenario and allowing for on-demand image-acquisition for both<br />

observation and calibration purposes.<br />

S2-<strong>PDGS</strong>-SYS-255<br />

The <strong>PDGS</strong> shall ensure that all the mission plan activities respect the operational<br />

restrictions defined in the Spacecraft Safety Constraints File (SSCF). In addition, the<br />

<strong>PDGS</strong> shall ensure the traceability for all the mission plans wrt the version of the SSCF<br />

used for their generation.<br />

S2-<strong>PDGS</strong>-SYS-260<br />

The <strong>PDGS</strong> shall be able to optimise the mission plan using load-balancing techniques<br />

amongst the <strong>Sentinel</strong>-2 constellation satellites.<br />

S2-<strong>PDGS</strong>-SYS-265<br />

The <strong>PDGS</strong> shall be able to determine the feasibility of the high-level mission operation<br />

scenario wrt the MSI observation requirements according to the available ground-station<br />

network.<br />

S2-<strong>PDGS</strong>-SYS-270<br />

The <strong>PDGS</strong> shall be able to plan ad-hoc data downlinks via the OCP and EDRS for testing<br />

purposes without interfering (e.g. data loss) with the core mission operations.<br />

S2-<strong>PDGS</strong>-SYS-275<br />

The <strong>PDGS</strong> shall be able to verify the impact of OCP data transmission wrt simultaneous<br />

MSI imaging activities.<br />

S2-<strong>PDGS</strong>-SYS-280<br />

The <strong>PDGS</strong> shall be able to constrain the X-Band downlink opportunities available for<br />

<strong>Sentinel</strong>-2 based on a pre-assignment resulting from a conflict analysis with other satellite<br />

missions (in particular <strong>Sentinel</strong>-1 and <strong>Sentinel</strong>-3).<br />

S2-<strong>PDGS</strong>-SYS-285<br />

The <strong>PDGS</strong> shall be able to constrain the data-relay downlink opportunities available for<br />

<strong>Sentinel</strong>-2 via the OCP and EDRS based on a pre-assignment resulting from a conflict<br />

analysis with other satellite missions (in particular <strong>Sentinel</strong>-1).<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!