<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-RD-09-0028<br />
page 177 of 204<br />
S2-<strong>PDGS</strong>-RP-065<br />
The <strong>PDGS</strong>/RP shall be able to trace the test execution records by means of a Test<br />
Analyser, and then accordingly provide statistics about completion of tests and the<br />
references to the items to be tested.<br />
S2-<strong>PDGS</strong>-RP-070<br />
The <strong>PDGS</strong>/RP shall be able to support <strong>PDGS</strong> end-to-end integration, verification and<br />
validation test campaigns (e.g. prior to deployment).<br />
5.19.2 PERFORMANCE REQUIREMENTS<br />
S2-<strong>PDGS</strong>-RP-075<br />
The <strong>PDGS</strong>/RP shall be able to reconfigure the Reference Platform in any centre<br />
configuration in not more than half a day of work.<br />
5.19.3 OPERATIONAL REQUIREMENTS<br />
S2-<strong>PDGS</strong>-RP-080<br />
The <strong>PDGS</strong>/RP shall be able to provide the historical reporting on the system baselines<br />
changes, traceability with reported/corrected anomalies (and possibly to the affected<br />
system requirements) as well as traceability along time of the configuration changes<br />
throughout system baseline evolutions.<br />
S2-<strong>PDGS</strong>-RP-085<br />
The <strong>PDGS</strong>/RP shall support the training of the <strong>PDGS</strong> operations teams taking advantage<br />
of its simulation and operational rehearsal capabilities.<br />
S2-<strong>PDGS</strong>-RP-090<br />
The <strong>PDGS</strong>/RP shall allow the configuration manager to perform the required hardware,<br />
software, documents, anomalies, etc. inventory activities (e.g. register/retrieve hardware<br />
configuration).<br />
S2-<strong>PDGS</strong>-RP-095<br />
The <strong>PDGS</strong>/RP shall support the preliminary activities to the following OSV activities:<br />
Compatibility tests<br />
Integration tests<br />
S2-<strong>PDGS</strong>-RP-100<br />
It shall be possible to reconfigure the <strong>PDGS</strong>/RP function by receiving from the operational<br />
<strong>PDGS</strong> Mission Control Configuration (MCC) function the mission configuration required as<br />
reference for testing and validation activities.<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.