18.11.2014 Views

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 177 of 204<br />

S2-<strong>PDGS</strong>-RP-065<br />

The <strong>PDGS</strong>/RP shall be able to trace the test execution records by means of a Test<br />

Analyser, and then accordingly provide statistics about completion of tests and the<br />

references to the items to be tested.<br />

S2-<strong>PDGS</strong>-RP-070<br />

The <strong>PDGS</strong>/RP shall be able to support <strong>PDGS</strong> end-to-end integration, verification and<br />

validation test campaigns (e.g. prior to deployment).<br />

5.19.2 PERFORMANCE REQUIREMENTS<br />

S2-<strong>PDGS</strong>-RP-075<br />

The <strong>PDGS</strong>/RP shall be able to reconfigure the Reference Platform in any centre<br />

configuration in not more than half a day of work.<br />

5.19.3 OPERATIONAL REQUIREMENTS<br />

S2-<strong>PDGS</strong>-RP-080<br />

The <strong>PDGS</strong>/RP shall be able to provide the historical reporting on the system baselines<br />

changes, traceability with reported/corrected anomalies (and possibly to the affected<br />

system requirements) as well as traceability along time of the configuration changes<br />

throughout system baseline evolutions.<br />

S2-<strong>PDGS</strong>-RP-085<br />

The <strong>PDGS</strong>/RP shall support the training of the <strong>PDGS</strong> operations teams taking advantage<br />

of its simulation and operational rehearsal capabilities.<br />

S2-<strong>PDGS</strong>-RP-090<br />

The <strong>PDGS</strong>/RP shall allow the configuration manager to perform the required hardware,<br />

software, documents, anomalies, etc. inventory activities (e.g. register/retrieve hardware<br />

configuration).<br />

S2-<strong>PDGS</strong>-RP-095<br />

The <strong>PDGS</strong>/RP shall support the preliminary activities to the following OSV activities:<br />

Compatibility tests<br />

Integration tests<br />

S2-<strong>PDGS</strong>-RP-100<br />

It shall be possible to reconfigure the <strong>PDGS</strong>/RP function by receiving from the operational<br />

<strong>PDGS</strong> Mission Control Configuration (MCC) function the mission configuration required as<br />

reference for testing and validation activities.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!