Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 53 of 204<br />

b. Commissioning: 3 months<br />

c. Nominal Operations: 7 years<br />

d. Extended Operations: 5 years<br />

e. Nominal <strong>Sentinel</strong>-2A and -2B simultaneous operations: 5-10 years (nominal and<br />

extended mission duration)<br />

Archive Operations 25 years after the end of the space segment operations<br />

S2-<strong>PDGS</strong>-SYS-485<br />

The <strong>PDGS</strong> shall support during the Commissioning Phase (CP) at least the following<br />

activities and shall be manned accordingly:<br />

Mission Planning, according to a pre-defined observation plan in line with the<br />

Commissioning Plan with the possibility to support additionally on-demand or shortterm<br />

pre-defined observation requests from CNES/CST as necessary.<br />

X/Ka-band data reception, with an increasing data volume during commissioning<br />

phase<br />

Systematic operational data processing of <strong>Sentinel</strong>-2 Level-0 and gradually higher<br />

level products<br />

Off-line interactive reprocessing for troubleshooting purposes (using a stand-alone<br />

(flexible) version of the operational processor)<br />

Auxiliary data handling and configuration control<br />

Instrument calibration according to CNES/CST inputs and instrument performance<br />

monitoring<br />

Product quality control<br />

Instrument and algorithms calibration & products validation in support to CNES/CST<br />

teams<br />

Verification of the on-board & on-ground payload data handling processes<br />

Characterisation of instrument performance in support to CNES/CST teams<br />

<strong>PDGS</strong> commissioning of all operational services in particular data-access front-end<br />

services<br />

S2-<strong>PDGS</strong>-SYS-490<br />

During Commissioning Phase, the <strong>PDGS</strong> shall receive and use the processing<br />

parameters (GIPP) and on-board MSI configuration parameters (NUC, IPS, FEE, TCM<br />

tables) supplied by CNES/CST.<br />

S2-<strong>PDGS</strong>-SYS-495<br />

The <strong>PDGS</strong> shall systematically request a data-acquisition plan for the constellation to<br />

cover nominally:<br />

All land surfaces between 56deg South latitude and 84deg North latitude;<br />

major islands (greater than 100 km2 size), EU islands and all the other small islands<br />

located at less than 20km from the coastline;<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.