<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-RD-09-0028<br />
page 53 of 204<br />
b. Commissioning: 3 months<br />
c. Nominal Operations: 7 years<br />
d. Extended Operations: 5 years<br />
e. Nominal <strong>Sentinel</strong>-2A and -2B simultaneous operations: 5-10 years (nominal and<br />
extended mission duration)<br />
Archive Operations 25 years after the end of the space segment operations<br />
S2-<strong>PDGS</strong>-SYS-485<br />
The <strong>PDGS</strong> shall support during the Commissioning Phase (CP) at least the following<br />
activities and shall be manned accordingly:<br />
Mission Planning, according to a pre-defined observation plan in line with the<br />
Commissioning Plan with the possibility to support additionally on-demand or shortterm<br />
pre-defined observation requests from CNES/CST as necessary.<br />
X/Ka-band data reception, with an increasing data volume during commissioning<br />
phase<br />
Systematic operational data processing of <strong>Sentinel</strong>-2 Level-0 and gradually higher<br />
level products<br />
Off-line interactive reprocessing for troubleshooting purposes (using a stand-alone<br />
(flexible) version of the operational processor)<br />
Auxiliary data handling and configuration control<br />
Instrument calibration according to CNES/CST inputs and instrument performance<br />
monitoring<br />
Product quality control<br />
Instrument and algorithms calibration & products validation in support to CNES/CST<br />
teams<br />
Verification of the on-board & on-ground payload data handling processes<br />
Characterisation of instrument performance in support to CNES/CST teams<br />
<strong>PDGS</strong> commissioning of all operational services in particular data-access front-end<br />
services<br />
S2-<strong>PDGS</strong>-SYS-490<br />
During Commissioning Phase, the <strong>PDGS</strong> shall receive and use the processing<br />
parameters (GIPP) and on-board MSI configuration parameters (NUC, IPS, FEE, TCM<br />
tables) supplied by CNES/CST.<br />
S2-<strong>PDGS</strong>-SYS-495<br />
The <strong>PDGS</strong> shall systematically request a data-acquisition plan for the constellation to<br />
cover nominally:<br />
All land surfaces between 56deg South latitude and 84deg North latitude;<br />
major islands (greater than 100 km2 size), EU islands and all the other small islands<br />
located at less than 20km from the coastline;<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.