18.11.2014 Views

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 186 of 204<br />

S2-<strong>PDGS</strong>-NET-085<br />

The MCN operations shall be operated on a 8 hours / 5 working days basis (TBC)<br />

S2-<strong>PDGS</strong>-NET-090<br />

The <strong>PDGS</strong> Network and VCN communications shall perform autonomously on a 24 hours<br />

/ 7 working days basis.<br />

S2-<strong>PDGS</strong>-NET-095<br />

The <strong>PDGS</strong> Network functions shall perform the real-time and historical monitoring of the<br />

status, load and performance of the physical network infrastructure in the different centres<br />

and across centres, including the analysis of source of non-authorised traffic.<br />

5.21.4 RAMS REQUIREMENTS<br />

S2-<strong>PDGS</strong>-NET-100<br />

The LAN shall provide the following Availability and reliability figures:<br />

Availability: 99,95% (TBC)<br />

Max Time To Repair: TBD<br />

Mean time between failures: TBD<br />

Comment: the evaluation is based on the assumption that the <strong>Sentinel</strong> 2 <strong>PDGS</strong> network<br />

delivers a minimum of 99.5% availability end-to-end measured over a period of one year.<br />

S2-<strong>PDGS</strong>-NET-105<br />

The DCN, FCN and DDN shall provide the following Availability and reliability figures:<br />

Availability: 99.6% (TBC)<br />

Max Time To Repair:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!