GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-RD-09-0028<br />
page 63 of 204<br />
S2-<strong>PDGS</strong>-SYS-780<br />
The <strong>PDGS</strong> operational baseline documentation (including technical and mission<br />
documentation) shall be kept under configuration control.<br />
S2-<strong>PDGS</strong>-SYS-785<br />
A failure in one of the <strong>PDGS</strong> composing element shall not cause failure of an interfacing<br />
element.<br />
S2-<strong>PDGS</strong>-SYS-790<br />
No single failure/mistake of <strong>PDGS</strong> operator shall lead to critical consequences.<br />
S2-<strong>PDGS</strong>-SYS-795<br />
The <strong>PDGS</strong> unmanned services shall be nominally available twenty-four hours/day, seven<br />
days/week.<br />
S2-<strong>PDGS</strong>-SYS-800<br />
It shall be possible for each <strong>PDGS</strong> element to be maintained once related operations have<br />
been started without necessitating a shutdown of the complete element.<br />
S2-<strong>PDGS</strong>-SYS-805<br />
It shall be possible to upgrade the <strong>PDGS</strong> configuration without affecting the currently ongoing<br />
<strong>PDGS</strong> operations and performance levels.<br />
S2-<strong>PDGS</strong>-SYS-810<br />
It shall be possible to upgrade operational <strong>PDGS</strong> facilities through configuration and<br />
hardware update without any changes to the SW code or code re-compilation and without<br />
any <strong>PDGS</strong> critical operation interruption.<br />
5.1.7 DESIGN & DEVELOPMENT REQUIREMENTS<br />
S2-<strong>PDGS</strong>-SYS-815<br />
The <strong>PDGS</strong> design shall derive from the <strong>PDGS</strong> functional and physical models described<br />
in the [OCD].<br />
S2-<strong>PDGS</strong>-SYS-820<br />
The <strong>PDGS</strong> shall be able to support independent elements and <strong>PDGS</strong> centre-level tests,<br />
end-to-end tests, and integration and verification activities through a dedicated Reference-<br />
Platform function.<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.