18.11.2014 Views

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 163 of 204<br />

S2-<strong>PDGS</strong>-MPL-485<br />

The <strong>PDGS</strong>/MPL function shall constrain the Downlink-Plan activities by the X-Band &<br />

ground stations time slots assigned to other <strong>Sentinel</strong>s Missions. The S-2 <strong>PDGS</strong> shall be<br />

able to share common ground-station resources with the other <strong>Sentinel</strong> Missions.<br />

S2-<strong>PDGS</strong>-MPL-490<br />

The <strong>PDGS</strong>/MPL function shall constrain the Downlink-Plan activities by the EDRS GEO<br />

Availability Segments assigned to the <strong>Sentinel</strong>-2 Mission.<br />

S2-<strong>PDGS</strong>-MPL-495<br />

The <strong>PDGS</strong>/MPL function shall provide the Mission-Plan (i.e. the image plan and the<br />

Downlink-Plan) in a single physical file according to the <strong>PDGS</strong>-FOS ICD.<br />

S2-<strong>PDGS</strong>-MPL-500<br />

The <strong>PDGS</strong>/MPL function shall generate the ground station schedule plan using the most<br />

accurate orbit information available.<br />

S2-<strong>PDGS</strong>-MPL-505<br />

The <strong>PDGS</strong>/MPL function shall generate the ground stations schedule plan (data reception<br />

and processing events) individually per each involved ground station.<br />

(AOS, LOS, FEP start processing, FEP stop processing events, etc. shall be separated<br />

per each involved station).<br />

S2-<strong>PDGS</strong>-MPL-510<br />

The <strong>PDGS</strong>/MPL function shall generate a local report on every manual or automatic<br />

planning activity triggered.<br />

S2-<strong>PDGS</strong>-MPL-515<br />

The <strong>PDGS</strong>/MPL function shall alert the operator on the failed automatic plan generation<br />

activities through M&C capabilities.<br />

5.17.4 RAMS REQUIREMENTS<br />

S2-<strong>PDGS</strong>-MPL-520<br />

The <strong>PDGS</strong>/MPL function shall ensure nominal operations unattended for better than<br />

99.7% of the time computed over one month time window and assuming a degradation of<br />

such figure for no more than one day.<br />

S2-<strong>PDGS</strong>-MPL-525<br />

The <strong>PDGS</strong>/MPL function shall ensure that the all the satellite / payload commanding<br />

activities are fulfilling the Spacecraft Operations Constraints defined in [SOCD].<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!