18.11.2014 Views

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 155 of 204<br />

S2-<strong>PDGS</strong>-MPL-180<br />

It shall be possible to constrain the Mission-Plan generated by the <strong>PDGS</strong>/MPL function<br />

according to the following minimum set of parameters configurable separately per<br />

spacecraft:<br />

the MSI sensing segment minimum length<br />

the MSI duty cycle<br />

the XBS duty cycles<br />

the OCP duty cycle<br />

etc<br />

S2-<strong>PDGS</strong>-MPL-185<br />

The <strong>PDGS</strong>/MPL function shall generate the ground-stations Acquisition-Schedule-Plan<br />

including recent (daily) orbit information (i.e. predicted orbit file, TLE, etc.) , and time<br />

segments applicable to the antenna reception and the required front-end processing<br />

activities.<br />

S2-<strong>PDGS</strong>-MPL-190<br />

The <strong>PDGS</strong>/MPL function, as part of the Acquisition-Schedule-Plan generation, shall be<br />

able to manage overlapping CGSs avoiding / minimizing the amount of data duplicated on<br />

them.<br />

S2-<strong>PDGS</strong>-MPL-195<br />

As part of the Mission-Plan generation activities, the <strong>PDGS</strong>/MPL function shall make use<br />

of the spacecraft model to derive the on-board memory usage along the orbit through<br />

including:<br />

the sensor data stream volume (compressed or not) deriving from the imaging plan<br />

and detector/compression configuration<br />

the MMFU occupation / usage (for nominal and NRT entries, FIFO logic) according to<br />

the imaging plan and Downlink-Plan<br />

the MMFU occupation / usage for the HKTM data according to the Downlink-Plan<br />

the MMFU occupation / usage for the Ancillary data according to the Downlink-Plan<br />

S2-<strong>PDGS</strong>-MPL-200<br />

The <strong>PDGS</strong>/MPL function shall be able to optimise the Downlink-Plan by delaying when<br />

appropriate the start of the MSI downlink in order to maximize the volume of data<br />

transmitted to the ground during the visibility window. This functionality shall be activated<br />

as an option.<br />

S2-<strong>PDGS</strong>-MPL-205<br />

The <strong>PDGS</strong>/MPL function shall be able to generate the EDRS effective booking plan to be<br />

forwarded to the EDRS user-segment according to the acknowledged Mission-Plans.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!