GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
GSC Sentinel-2 PDGS SRD - emits - ESA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-RD-09-0028<br />
page 37 of 204<br />
4.2 Open Issues<br />
The present document includes TBD/TBC in relation to the following issues still open.<br />
<br />
<br />
<br />
<br />
EDRS GS and S/S technical specifications and interfaces. Technical details are<br />
missing regarding the interfaces between the <strong>PDGS</strong> and the EDRS GS as well as<br />
the <strong>PDGS</strong> functions necessary for the exploitation of the EDRS in support to the<br />
<strong>Sentinel</strong>-2 mission. Technical details are missing regarding the S2G ICD for the<br />
EDRS satellite limiting the definition/consolidation of requirements for the Ka-band<br />
data reception and ingestion function of the <strong>PDGS</strong>.<br />
Spacecraft(s) Safety Constraints File. A complete list of <strong>Sentinel</strong>-2 Spacecraft(s)<br />
Constraints affecting the mission planning as well as which constraints shall be<br />
verified by the FOS or by the <strong>PDGS</strong> is still to be defined.<br />
Next Generation User Services for Earth Observation (ngEO) technical<br />
specifications and interfaces. The ngEO system will be a new element of <strong>ESA</strong>’s<br />
Multi-Mission User Services (MMUS) environment reused for the <strong>Sentinel</strong>-2 <strong>PDGS</strong>.<br />
It is complemented with the overall MMUS by other legacy elements such as Single<br />
Sign-On (SSO), the Support-Desk, etc. As being a new element under design and<br />
development, its detailed baseline, interfaces within the <strong>Sentinel</strong>-2 <strong>PDGS</strong>, and<br />
detailed operation scenario with other <strong>PDGS</strong> elements are still to be defined at the<br />
level of Technical Specifications and ICDs.<br />
<strong>PDGS</strong> physical layout and interconnecting network infrastructure. The <strong>PDGS</strong><br />
ground infrastructure composed of core ground stations, complementary centres<br />
and an interconnecting network to support the operations is still to be settled. In this<br />
respect, the system technical budget [STBD] (cf. [ND-10]) provides the logic and<br />
elements required to derive the firm <strong>PDGS</strong> technical budget once the physical<br />
layout is defined.<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.