18.11.2014 Views

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

GSC Sentinel-2 PDGS SRD - emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>SRD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-RD-09-0028<br />

page 37 of 204<br />

4.2 Open Issues<br />

The present document includes TBD/TBC in relation to the following issues still open.<br />

<br />

<br />

<br />

<br />

EDRS GS and S/S technical specifications and interfaces. Technical details are<br />

missing regarding the interfaces between the <strong>PDGS</strong> and the EDRS GS as well as<br />

the <strong>PDGS</strong> functions necessary for the exploitation of the EDRS in support to the<br />

<strong>Sentinel</strong>-2 mission. Technical details are missing regarding the S2G ICD for the<br />

EDRS satellite limiting the definition/consolidation of requirements for the Ka-band<br />

data reception and ingestion function of the <strong>PDGS</strong>.<br />

Spacecraft(s) Safety Constraints File. A complete list of <strong>Sentinel</strong>-2 Spacecraft(s)<br />

Constraints affecting the mission planning as well as which constraints shall be<br />

verified by the FOS or by the <strong>PDGS</strong> is still to be defined.<br />

Next Generation User Services for Earth Observation (ngEO) technical<br />

specifications and interfaces. The ngEO system will be a new element of <strong>ESA</strong>’s<br />

Multi-Mission User Services (MMUS) environment reused for the <strong>Sentinel</strong>-2 <strong>PDGS</strong>.<br />

It is complemented with the overall MMUS by other legacy elements such as Single<br />

Sign-On (SSO), the Support-Desk, etc. As being a new element under design and<br />

development, its detailed baseline, interfaces within the <strong>Sentinel</strong>-2 <strong>PDGS</strong>, and<br />

detailed operation scenario with other <strong>PDGS</strong> elements are still to be defined at the<br />

level of Technical Specifications and ICDs.<br />

<strong>PDGS</strong> physical layout and interconnecting network infrastructure. The <strong>PDGS</strong><br />

ground infrastructure composed of core ground stations, complementary centres<br />

and an interconnecting network to support the operations is still to be settled. In this<br />

respect, the system technical budget [STBD] (cf. [ND-10]) provides the logic and<br />

elements required to derive the firm <strong>PDGS</strong> technical budget once the physical<br />

layout is defined.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!