- Page 1 and 2:
City of Greater Sudbury Transportat
- Page 3 and 4:
TABLE OF CONTENTS CONTINUED 4. TRAF
- Page 5 and 6:
FIGURES CONTINUED Figure 8.1.1 Road
- Page 7 and 8:
EXECUTIVE SUMMARY Context The City
- Page 9 and 10:
A second series of public informati
- Page 11 and 12:
l. Construction of one additional w
- Page 13 and 14:
18. Continue to require the prepara
- Page 15 and 16:
Data Collection and Monitoring 43.
- Page 17 and 18:
Levack Onaping Dowling Worthington
- Page 19 and 20:
Schedule C Projects generally inclu
- Page 21 and 22:
1.5. Scope of Work The scope of wor
- Page 23 and 24:
A second series of public informati
- Page 25 and 26:
Chapter 11 - IMPLEMENTATION PLAN Wi
- Page 27 and 28:
The former City of Sudbury makes up
- Page 29 and 30:
Truck Routes Wahnapitae First Natio
- Page 31 and 32:
Existing Daily Traffic Volumes (200
- Page 33 and 34:
2.3.2. Screenlines The operation of
- Page 35 and 36:
Ramsey Lake Road in the westbound d
- Page 37 and 38:
Based on findings of the household
- Page 39 and 40:
Conventional Transit Routes Capreol
- Page 41 and 42:
To address these issues, Greater Su
- Page 43 and 44:
The following list of accessibility
- Page 45 and 46:
The results to these questions are
- Page 47 and 48:
2.9.2. Chamber of Commerce The Grea
- Page 49 and 50:
3. HOUSEHOLD SURVEY 3.1. Methodolog
- Page 51 and 52:
A comparison of trip purpose betwee
- Page 53 and 54:
4. TRAFFIC FORECASTING MODEL 4.1. M
- Page 55 and 56:
Figure 4.2.1 - Traffic Zone System
- Page 57 and 58:
Table 4.3.1 - Assumed Auto Capaciti
- Page 59 and 60:
Figure 4.4.1 - P.M. Peak Period Hom
- Page 61 and 62: Rio Can Centre Super Mall New Sudbu
- Page 63 and 64: The goodness of fit for these FIGUR
- Page 65 and 66: Table 4.6.1 - Model Validation Scre
- Page 67 and 68: 5. FUTURE CONDITIONS To generate fu
- Page 69 and 70: Daily Travel Demand City of Greater
- Page 71 and 72: Table 5.5.1 - Screenline Analysis -
- Page 73 and 74: Year 2021 Capacity Deficiencies Cit
- Page 75 and 76: Building Blocks For A Comprehensive
- Page 77 and 78: 7. EVALUATION OF ROAD NETWORK IMPRO
- Page 79 and 80: Table 7.3.1 - Example of Comparativ
- Page 81 and 82: The use of Barrydowne Road as an al
- Page 83 and 84: A truck bypass is required for a nu
- Page 85 and 86: The Barrydowne Road extension alter
- Page 87 and 88: Road Improvements Common to All Alt
- Page 89 and 90: 8.2. Evaluation of the Road Network
- Page 91 and 92: Table 8.2.1 - Road Network Improvem
- Page 93 and 94: In terms of the economic environmen
- Page 95 and 96: 8.3. Potential Road Improvements Be
- Page 97 and 98: 9. LOCAL ROAD IMPROVEMENTS 9.1. Loc
- Page 99 and 100: 4. Kathleen Street Improvements Kat
- Page 101 and 102: for Bancroft Drive, minimal traffic
- Page 103 and 104: Figure 9.1.2 - Montrose Road Extens
- Page 105 and 106: Figure 9.1.4 - Martilla Drive Exten
- Page 107 and 108: Figure 9.1.6 - Barrydowne South Con
- Page 109 and 110: Provide dual northbound left turn l
- Page 111: 10. ROAD DESIGNATIONS 10.1. Existin
- Page 115 and 116: Under future conditions, the sectio
- Page 117 and 118: 10.3. Road Access Policies Policies
- Page 119 and 120: Greater Sudbury staff should encour
- Page 121 and 122: Widen MR 80. Provide a continuous l
- Page 123 and 124: 11.3. Funding Options Capital outla
- Page 125 and 126: 12. RECOMMENDATIONS Recommendations
- Page 127 and 128: a. The Hawthorne Drive Connection b
- Page 129 and 130: 25. Continue to improve coverage th