City of Greater Sudbury Transportation Study Report
City of Greater Sudbury Transportation Study Report
City of Greater Sudbury Transportation Study Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 5.1.2 - Year 2021 Employment (Final)<br />
Year 2001 Year 2021<br />
Employment<br />
Employment<br />
Capreol 730 784<br />
Nickel Centre 2505 3086<br />
Onaping Falls 1890 2043<br />
Rayside-Balfour 2800 3128<br />
<strong>Sudbury</strong> 49749 59650<br />
Valley-East 4080 5337<br />
Walden 3905 4733<br />
65659 78761<br />
5.2. Future Travel Demands<br />
Future travel demand and future capacity deficiencies were determined for the p.m. peak<br />
hour by applying the four stages <strong>of</strong> the model (i.e. trip generation, trip distribution, modal split<br />
and assignment) as described in Section 4 <strong>of</strong> this report, and using future population and<br />
employment figures and the existing and future road network as inputs.<br />
To determine future travel demands, a Year 2021 daily auto trip matrix was developed using<br />
a growth factor technique and the Year 2021 population and employment figures.<br />
Figure 5.2.1 shows the current daily travel demand and the growth in daily travel demand<br />
projected by 2021 for the former municipalities. The largest increases are expected to be<br />
within Valley East, and, between Valley East and the former <strong>City</strong> <strong>of</strong> <strong>Sudbury</strong>. These<br />
increases are 22% and 18% respectively. 13% increases can be expected between <strong>Sudbury</strong><br />
and Nickel Centre, <strong>Sudbury</strong> and Walden, within Walden, within <strong>Sudbury</strong> and within Nickel<br />
Centre.<br />
CITY OF GREATER SUDBURY<br />
OFFICIAL PLAN BACKGROUND REPORT<br />
September 2005 Page 53