12. RECOMMENDATIONS<br />

Recommendations are based on technical analysis, evaluation <strong>of</strong> alternatives, and are also<br />

reflective <strong>of</strong> the input and comments received from the general public and key stakeholders.<br />

This <strong>Transportation</strong> <strong>Study</strong> has identified a number <strong>of</strong> specific infrastructure improvements,<br />

and policies that require implementation over the life <strong>of</strong> the plan. It is important to note that<br />

the success <strong>of</strong> the plan will depend on implementation <strong>of</strong> all or most <strong>of</strong> its elements, since<br />

many <strong>of</strong> these elements work together within the overall transportation system. It is also<br />

important to ensure that these are included in <strong>Greater</strong> <strong>Sudbury</strong>’s new Official Plan.<br />

The following is a listing <strong>of</strong> specific recommendations relating to each transportation<br />

element.<br />

Road Rehabilitation<br />

1. Give priority to the preservation <strong>of</strong> existing infrastructure before adding new roadway<br />

sections.<br />

2. Develop and implement an Asset Management Strategy that considers life cycle costing,<br />

desirable pavement condition indices, and the availability <strong>of</strong> funding.<br />

3. Give higher priority to roads with higher classification, and with heavier traffic volumes.<br />

4. Maintain roads that are predominantly used by trucks at a higher standard.<br />

Road Improvements<br />

5. Initiate the following within the next five years:<br />

a. Environmental Assessment Studies (update previous EA studies) for the following:<br />

i. Maley Drive extension and widening.<br />

ii.<br />

iii.<br />

iv.<br />

Alternate Access to Laurentian University and South Shore <strong>of</strong> Ramsey Lake.<br />

MR 15 widening.<br />

MR 35 widening.<br />

v. LaSalle Boulevard widening.<br />

vi.<br />

vii.<br />

The Kingsway widenings.<br />

MR 80 widening.<br />

b. Construction <strong>of</strong> the Maley Drive extension and widening.<br />

c. Construction <strong>of</strong> the New University Link.<br />

CITY OF GREATER SUDBURY<br />

OFFICIAL PLAN BACKGROUND REPORT<br />

September 2005 Page 110