City of Greater Sudbury Transportation Study Report
City of Greater Sudbury Transportation Study Report
City of Greater Sudbury Transportation Study Report
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FIGURE 1.4.1 - CLASS ENVIRONMENTAL ASSESSMENT PROCESS<br />
PHASE 1<br />
Identify & Describe the Problem<br />
Agency / Public<br />
Consultation<br />
PUBLIC<br />
INFORMATION SESSION #1<br />
PHASE 2<br />
Evaluate Alternative Solutions & Establish<br />
the Preferred Solution<br />
Agency / Public<br />
Consultation<br />
PUBLIC<br />
INFORMATION SESSION #2<br />
File<br />
Master<br />
Plan<br />
Agency / Public<br />
Consultation<br />
NOTIFICATION OF FILING<br />
Opportunity to<br />
Appeal<br />
PUBLIC REVIEW<br />
PERIOD<br />
Schedule ‘C’ Projects<br />
Future Schedule ‘A’ and ‘B’<br />
Projects identified from the<br />
<strong>Study</strong><br />
PHASE 3<br />
Identify Alternative Design Concepts,<br />
Potential Environmental Effects and the<br />
Preferred Concept<br />
Mandatory Review<br />
Agency / Public Consultation<br />
Discretionary Review<br />
Agency / Public Consultation<br />
PHASE 4<br />
Prepare Environmental <strong>Study</strong> <strong>Report</strong> Documenting<br />
File<br />
Environmental<br />
<strong>Study</strong> <strong>Report</strong><br />
Mandatory Review<br />
Agency / Public Consultation<br />
Opportunity for<br />
Part II Order<br />
30 CALENDAR DAY<br />
PUBLIC REVIEW PERIOD<br />
PHASE 5<br />
Complete Drawings & Documents -<br />
Proceed to Construct, Operate & Monitor<br />
Project<br />
CITY OF GREATER SUDBURY<br />
OFFICIAL PLAN BACKGROUND REPORT<br />
September 2005 Page 5