Recommended Network<br />

New Roads<br />

Description<br />

Maley Drive Extension<br />

Extend Maley Drive to LaSalle Boulevard (4-lane basic cross section).<br />

Extend Montrose Avenue to Maley Drive Extension.<br />

New University Link<br />

Construct a new road connecting Regent street (close to Access Road) and the<br />

University Road.<br />

Road Widening<br />

Description<br />

Maley Drive Widening<br />

Widen the existing 2-lane basic cross section to a 4-Lane basic cross section from<br />

Barrydowne to Falconbridge Highway.<br />

MR 15 Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from MR 80<br />

to Belisle Drive.<br />

MR 35 Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from Azilda<br />

to Chelmsford.<br />

MR 80 Widening<br />

Widen the existing 4-lane basic cross section to a 6-lane basic cross section from<br />

LaSalle Boulevard to Main Street.<br />

Notre Dame Ave. Widening<br />

Widen the existing 4-lane cross section to a 6-lane basic cross section from<br />

Kathleen Street to LaSalle Boulevard.<br />

LaSalle Blvd. Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from the<br />

CPR Overhead to 0.3 km west <strong>of</strong> Notre Dame Avenue.<br />

Southwest Bypass<br />

4-Laning**<br />

Widen the existing 2-lane cross section to a 4-lane cross section from the<br />

interchange at MR 55 to Long Lake Road.<br />

Kingsway Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from<br />

Falconbridge Highway to the Southeast Bypass.<br />

Kingsway Widening<br />

Widen the Kingsway from the intersection <strong>of</strong> Lloyd Street and Brady Street to<br />

430 m east <strong>of</strong> Kitchener Avenue.<br />

Figure 8.2.1<br />

Operational<br />

Improvements<br />

Paris / Regent Street<br />

Description<br />

Convert the existing left turn through lanes on Paris Street and Long Lake Road to<br />

left turn lanes. Add through lanes on Paris Street and Long Lake Road.<br />

Paris / Ramsey Lake Road<br />

Add a northbound right turn channelization ramp.<br />

Falconbridge Highway<br />

Provide a continuous left turn lane from LaSalle Blvd. to Garson-Coniston Road.<br />

LaSalle Blvd. / Notre Dame<br />

Ave. Intersection<br />

Provide dual eastbound, westbound and southbound left turn lanes and one<br />

additional northbound and southbound through lanes.<br />

LaSalle Blvd. / Barrydowne<br />

Intersection<br />

Provide one additional westbound and one additional northbound left turn lanes as<br />

well as one additional northbound through lane.<br />

LaSalle Blvd. /<br />

Falconbridge Highway<br />

Provide left turn lane improvements and a right turn lane southbound along<br />

Falconbridge Highway.<br />

MR 80 Widening<br />

Provide a continuous left turn lane from Donaldson Crescent to Second Street.<br />

*Excludes Property ** Provincial facility (if not widened, would require widening <strong>of</strong> MR 55@ $13M)<br />

<strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Sudbury</strong><br />

<strong>Transportation</strong> <strong>Study</strong><br />

Estimated Cost*<br />

$27.8 M<br />

$7.4 M<br />

Estimated Cost*<br />

$3.4 M<br />

$3.5 M<br />

$9.5 M<br />

$18.1 M<br />

$5.0 M<br />

$4.6M<br />

$22.8 M<br />

$6.0 M<br />

$7.2 M<br />

Estimated Cost*<br />

$2.0 M<br />

$0.5 M<br />

$7.0 M<br />

$3.5 M<br />

$3.0 M<br />

$2.0 M<br />

$8.0 M