- Page 1 and 2: City of Greater Sudbury Transportat
- Page 3 and 4: TABLE OF CONTENTS CONTINUED 4. TRAF
- Page 5 and 6: FIGURES CONTINUED Figure 8.1.1 Road
- Page 7 and 8: EXECUTIVE SUMMARY Context The City
- Page 9 and 10: A second series of public informati
- Page 11 and 12: l. Construction of one additional w
- Page 13 and 14: 18. Continue to require the prepara
- Page 15: Data Collection and Monitoring 43.
- Page 19 and 20: Schedule C Projects generally inclu
- Page 21 and 22: 1.5. Scope of Work The scope of wor
- Page 23 and 24: A second series of public informati
- Page 25 and 26: Chapter 11 - IMPLEMENTATION PLAN Wi
- Page 27 and 28: The former City of Sudbury makes up
- Page 29 and 30: Truck Routes Wahnapitae First Natio
- Page 31 and 32: Existing Daily Traffic Volumes (200
- Page 33 and 34: 2.3.2. Screenlines The operation of
- Page 35 and 36: Ramsey Lake Road in the westbound d
- Page 37 and 38: Based on findings of the household
- Page 39 and 40: Conventional Transit Routes Capreol
- Page 41 and 42: To address these issues, Greater Su
- Page 43 and 44: The following list of accessibility
- Page 45 and 46: The results to these questions are
- Page 47 and 48: 2.9.2. Chamber of Commerce The Grea
- Page 49 and 50: 3. HOUSEHOLD SURVEY 3.1. Methodolog
- Page 51 and 52: A comparison of trip purpose betwee
- Page 53 and 54: 4. TRAFFIC FORECASTING MODEL 4.1. M
- Page 55 and 56: Figure 4.2.1 - Traffic Zone System
- Page 57 and 58: Table 4.3.1 - Assumed Auto Capaciti
- Page 59 and 60: Figure 4.4.1 - P.M. Peak Period Hom
- Page 61 and 62: Rio Can Centre Super Mall New Sudbu
- Page 63 and 64: The goodness of fit for these FIGUR
- Page 65 and 66: Table 4.6.1 - Model Validation Scre
- Page 67 and 68:
5. FUTURE CONDITIONS To generate fu
- Page 69 and 70:
Daily Travel Demand City of Greater
- Page 71 and 72:
Table 5.5.1 - Screenline Analysis -
- Page 73 and 74:
Year 2021 Capacity Deficiencies Cit
- Page 75 and 76:
Building Blocks For A Comprehensive
- Page 77 and 78:
7. EVALUATION OF ROAD NETWORK IMPRO
- Page 79 and 80:
Table 7.3.1 - Example of Comparativ
- Page 81 and 82:
The use of Barrydowne Road as an al
- Page 83 and 84:
A truck bypass is required for a nu
- Page 85 and 86:
The Barrydowne Road extension alter
- Page 87 and 88:
Road Improvements Common to All Alt
- Page 89 and 90:
8.2. Evaluation of the Road Network
- Page 91 and 92:
Table 8.2.1 - Road Network Improvem
- Page 93 and 94:
In terms of the economic environmen
- Page 95 and 96:
8.3. Potential Road Improvements Be
- Page 97 and 98:
9. LOCAL ROAD IMPROVEMENTS 9.1. Loc
- Page 99 and 100:
4. Kathleen Street Improvements Kat
- Page 101 and 102:
for Bancroft Drive, minimal traffic
- Page 103 and 104:
Figure 9.1.2 - Montrose Road Extens
- Page 105 and 106:
Figure 9.1.4 - Martilla Drive Exten
- Page 107 and 108:
Figure 9.1.6 - Barrydowne South Con
- Page 109 and 110:
Provide dual northbound left turn l
- Page 111 and 112:
10. ROAD DESIGNATIONS 10.1. Existin
- Page 113 and 114:
TABLE 10.1.1 - ROAD CLASSIFICATION
- Page 115 and 116:
Under future conditions, the sectio
- Page 117 and 118:
10.3. Road Access Policies Policies
- Page 119 and 120:
Greater Sudbury staff should encour
- Page 121 and 122:
Widen MR 80. Provide a continuous l
- Page 123 and 124:
11.3. Funding Options Capital outla
- Page 125 and 126:
12. RECOMMENDATIONS Recommendations
- Page 127 and 128:
a. The Hawthorne Drive Connection b
- Page 129 and 130:
25. Continue to improve coverage th