21.11.2014 Views

City of Greater Sudbury Transportation Study Report

City of Greater Sudbury Transportation Study Report

City of Greater Sudbury Transportation Study Report

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Road Improvements Common to All Alternative Networks<br />

New Roads<br />

Description<br />

Maley Drive Extension<br />

Extend Maley Drive to LaSalle Boulevard (4-lane basic cross section).<br />

Extend Montrose Ave. to Maley Drive Extension.<br />

Road Widening<br />

Description<br />

Maley Drive Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from<br />

Barrydowne to Falconbridge Highway.<br />

MR 15 Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from MR 80<br />

to Belisle Drive.<br />

MR 35 Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from Azilda<br />

to Chelmsford.<br />

Notre Dame Ave. Widening<br />

Widen the existing 4-lane cross section to a 6-lane basic cross section from<br />

Kathleen Street to LaSalle Boulevard.<br />

LaSalle Boulevard<br />

Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from the<br />

CPR Overhead to 0.3 km west <strong>of</strong> Notre Dame Avenue.<br />

Southwest Bypass 4-<br />

Laning*<br />

Widen the existing 2-lane cross section to a 4-lane cross section from the<br />

interchange at MR 55 to Long Lake Road.<br />

Kingsway Widening<br />

Widen the existing 2-lane cross section to a 4-lane basic cross section from<br />

Falconbridge Highway to the Southeast Bypass.<br />

Kingsway Widening<br />

Widen the Kingsway from the intersection <strong>of</strong> Lloyd Street and Brady Street to<br />

430 m east <strong>of</strong> Kitchener Avenue.<br />

Operational<br />

Improvements<br />

Description<br />

Paris / Ramsey Lake Road<br />

Add a northbound right turn channelization ramp.<br />

Paris / Regent Street<br />

Convert existing left turn through lanes on Paris Street and Long Lake Road to left<br />

turn lanes. Add through lanes on Paris Street and Long Lake Road.<br />

Figure 8.1.1<br />

Falconbridge Highway<br />

LaSalle Blvd. / Notre Dame<br />

Ave. Intersection<br />

Provide a continuous left turn lane from LaSalle Blvd. to Garson-Coniston Road.<br />

Provide dual eastbound, westbound and southbound left turn lanes and one<br />

additional northbound and southbound through lanes.<br />

LaSalle Blvd. / Barrydowne<br />

Intersection<br />

Provide one additional westbound and one additional northbound left turn lanes as<br />

well as one additional northbound through lane.<br />

LaSalle Blvd. / Falconbridge<br />

Highway<br />

Provide left turn lane improvements and a right turn lane southbound along<br />

Falconbridge Highway.<br />

MR 80 Widening<br />

Provide a continuous left turn lane from Donaldson Crescent to Second Street.<br />

*Provincial facility (if not widened, would require widening <strong>of</strong> MR 55)<br />

<strong>City</strong> <strong>of</strong> <strong>Greater</strong> <strong>Sudbury</strong><br />

<strong>Transportation</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!