27.12.2014 Views

QLogic OFED+ Host Software User Guide, Rev. B

QLogic OFED+ Host Software User Guide, Rev. B

QLogic OFED+ Host Software User Guide, Rev. B

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

I–Useful Programs and Files<br />

Summary and Descriptions of Useful Programs<br />

NOTE:<br />

• The hostnames in the nodefile are Ethernet hostnames, not IPv4<br />

addresses.<br />

• To create a nodefile, use the ibhosts program. It will generate a list<br />

of available nodes that are already connected to the switch.<br />

ipath_checkout performs the following seven tests on the cluster:<br />

1. Executes the ping command to all nodes to verify that they all are<br />

reachable from the front end.<br />

2. Executes the ssh command to each node to verify correct configuration of<br />

ssh.<br />

3. Gathers and analyzes system configuration from the nodes.<br />

4. Gathers and analyzes RPMs installed on the nodes.<br />

5. Verifies InfiniPath hardware and software status and configuration, including<br />

tests for link speed, PIO bandwidth (incorrect MTRR settings), and MTU<br />

size.<br />

6. Verifies the ability to mpirun jobs on the nodes.<br />

7. Runs a bandwidth and latency test on every pair of nodes and analyzes the<br />

results.<br />

The options available with ipath_checkout are shown in Table I-2.<br />

Table I-2. ipath_checkout Options<br />

Command<br />

-h, --help<br />

-v, --verbose<br />

-vv, --vverbose<br />

-vvv, --vvverbose<br />

-c, --continue<br />

Meaning<br />

These options display help messages describing how a command<br />

is used.<br />

These options specify three successively higher levels of<br />

detail in reporting test results. There are four levels of detail<br />

in all, including the case where none of these options are<br />

given.<br />

When this option is not specified, the test terminates when<br />

any test fails. When specified, the tests continue after a failure,<br />

with failing nodes excluded from subsequent tests.<br />

D000046-005 B I-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!