<strong>State</strong> <strong>of</strong> Saldanha <strong>Bay</strong> & Langebaan Lagoon <strong>2011</strong><br />

Activities & discharges<br />

facilities for <strong>the</strong> proposed Sunrise Energy LPG in Saldanha and <strong>the</strong>se will be outlined in <strong>the</strong> scoping<br />

report for <strong>the</strong> study due for release at <strong>the</strong> end <strong>of</strong> July 2012 (Claire Alborough, ERM, pers. comm.).<br />

Potential impacts to <strong>the</strong> marine environment, that need to be considered, include changes in water<br />

quality, change in sediment dynamics, impacts to benthic fauna, visual and landscape impacts, noise,<br />

socio-economic impacts and cumulative impacts (ERM 2010). Impacts to <strong>the</strong> marine environment<br />

may also be incurred as a result <strong>of</strong> storm water effluents from <strong>the</strong> on-shore storage facility.<br />

3.3.4 Development <strong>of</strong> <strong>the</strong> Salamander <strong>Bay</strong> Boat yard<br />

The Special Forces Regiment <strong>of</strong> <strong>the</strong> South African National Defence Force (SANDF) commenced <strong>the</strong><br />

construction <strong>of</strong> a boat park in Salamander <strong>Bay</strong> at <strong>the</strong> entrance to Langebaan Lagoon in 2009,<br />

designed to house boats belonging to <strong>the</strong> regiment (Figure 3.10). The shores within Salamander <strong>Bay</strong><br />

are dominated by sandy beaches and are considered sheltered. S<strong>of</strong>t bottom habitat dominates <strong>the</strong><br />

subtidal benthos, which attains depths <strong>of</strong> no greater than 5 m. In order to increase <strong>the</strong> size <strong>of</strong> <strong>the</strong><br />

boat house an area <strong>of</strong> 550 m 2 within <strong>the</strong> rocky intertidal zone was excavated and an area <strong>of</strong> 275 m 2<br />

<strong>of</strong> subtidal s<strong>of</strong>t bottom habitat was dredged to allow for <strong>the</strong> placement <strong>of</strong> two column footings and<br />

25 wet column bases.<br />

Figure 3.10. The Salamander <strong>Bay</strong> boatpark in Saldanha (central strip <strong>of</strong> <strong>the</strong> picture).<br />

The construction activities commenced before an <strong>Environmental</strong> Impact Assessment (EIA)<br />

had been conducted. An EIA was commissioned retrospectively in terms <strong>of</strong> section 24G <strong>of</strong> <strong>the</strong><br />

National <strong>Environmental</strong> Management Act (Act no 107 <strong>of</strong> 1998). A marine ecology report was<br />

compiled as part <strong>of</strong> <strong>the</strong> EIA to assess <strong>the</strong> impacts which had already occurred through <strong>the</strong><br />

development <strong>of</strong> <strong>the</strong> boat yard, and <strong>the</strong> potential impacts which may result through <strong>the</strong> long-term<br />

use <strong>of</strong> <strong>the</strong> facility. The excavation <strong>of</strong> <strong>the</strong> intertidal and subtidal areas involved <strong>the</strong> mechanical<br />

removal <strong>of</strong> large boulders and <strong>the</strong> dredging <strong>of</strong> sediments. It was indicated that <strong>the</strong> impact <strong>of</strong> this<br />

excavation was <strong>of</strong> a high consequence as it resulted in a permanent loss <strong>of</strong> habitat and organisms in<br />

both <strong>the</strong> intertidal and subtidal zones. However, <strong>the</strong> affected area was acknowledged to be small,<br />

and <strong>the</strong> habitat common to <strong>the</strong> Saldanha <strong>Bay</strong> system.<br />

The dredging <strong>of</strong> <strong>the</strong> subtidal zone, which took place between May 2009 and May 2010, led<br />

to <strong>the</strong> release <strong>of</strong> a grey coloured sediment plume. Chemical analyses <strong>of</strong> <strong>the</strong> water and <strong>the</strong> dredged<br />

sediment indicated that <strong>the</strong>re had been no contamination <strong>of</strong> cadmium or arsenic and only slightly<br />