• Review of documentation relating to compliance with relevant procedures and<br />

processes;<br />

• Review of relevant intra- and inter- agency correspondence;<br />

• Assessment of data relating to compliance elements;<br />

• Review of previous auditee incidents relating to the compliance audits being<br />

assessed;<br />

• Interviews, where appropriate, with DSE and <strong>VicForests</strong> managerial and technical<br />

staff.<br />

Field Assessment<br />

Field assessment will be required for audits conducted under <strong>Module</strong>s 5 and 7, and<br />

may also be required as part of any Special Purpose Audits.<br />

The procedures for the field assessment will be determined by the Auditor, but the<br />

following guidance is provided as a preferred process.<br />

Before commencing the field visits, the Auditor would hold an opening meeting in<br />

each region being audited. The aim of this meeting would be to:<br />

• Introduce the members of the audit team to the auditee’s key personnel;<br />

• Review the scope, objectives, audit plan and confirm the audit timetable;<br />

• Provide a short summary of the methods and procedures to be used to conduct<br />

the audit;<br />

• Ensure that the communication links between the audit team and the auditee are<br />

established;<br />

• Confirm that the resources and facilities needed by the audit team are available;<br />

• Confirm the times and dates for the interim end-of-day meetings and the closing<br />

meeting;<br />

• Promote active participation by the auditee; and<br />

• Allow the auditee to invite the relevant forest operator/contractor to observe field<br />

assessments undertaken at sites that they have harvested;<br />

• Induct the audit team with reqard to site specific health, safety and emergency<br />

procedures.<br />

The DSE contract manager will reserve the right to attend any field audits undertaken<br />

under the FAP to monitor the performance of the audit team with respect to quality<br />

control and health and safety elements outlined in the audit plan.<br />

FOREST AUDIT PROGRAM – MODULE 2 AUDIT PROCESS PAGE 11