12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Compliance Element Parameter Measurement<br />

Guidance for compliance element measurements are described herein.<br />

Completed Coupes<br />

Roading<br />

• Assess at least 500 m of road where present. Measure and record distance and<br />

slope between drainage structures. Record situations (and distances) where<br />

drainage spacing does not comply with prescriptions or where drainage is<br />

ineffective.<br />

• Assess up to 500 m permanent roadline where present. Assess clearing widths<br />

against prescriptive requirements and, where present, measure clearing width at<br />

two points along the 500 m section. Record results and comments on compliance<br />

with relevant prescriptions.<br />

Snig and Forwarding Tracks<br />

• Inspect as much snig track as possible (at least 200 m) during coupe inspection.<br />

Record measured distance of snig track inspected and assess whether drainage<br />

structures are within prescriptive requirements.<br />

Reserved Area Protection<br />

• Assess at least two 200 m lengths of buffer strip. Measure widths for at least 2<br />

and up to 4 points along the two strips. Record results and comments on<br />

compliance with relevant prescriptions.<br />

• Assess rainforest buffer as much as possible during coupe inspection. Measure<br />

widths for at least 2 and up to 4 points along two 200 m strips. Record results<br />

and comments on compliance with relevant prescriptions.<br />

• Assess special habitat or landscape buffers. Measure widths for at least 2 and up<br />

to 4 points along two 200 m strips. Record results and comments on compliance<br />

with relevant prescriptions.<br />

• Note a maximum of 800 m of buffer is to be measured at each coupe comprising<br />

a combination of streamside reserve, special habitat, landscape or rainforest.<br />

• Assess filter strip as much as possible during coupe inspection. Measure widths<br />

for at least 2 and up to 4 points along one 200 m strip where necessary to<br />

determine compliance to relevant prescriptions. Record results and comments on<br />

compliance with relevant prescriptions<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE A-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!