• Participating in Community Open Days as part of the field component of <strong>Module</strong> 5,<br />

which will allow community representatives to observe the audit of a coupe and<br />

engage with the audit team during the field inspection.<br />

• Receiving and reviewing the outcomes of the audits undertaken through access to<br />

Audit Reports published by DSE, and any subsequent follow up presentations<br />

delivered to interest groups (as determined by DSE).<br />

Each Community Open Day will comprise the following:<br />

• Pre Site Briefing: to be held at a central location to be determined by DSE, to<br />

inform the participants on: health and safety requirements while on the coupe; the<br />

role of the Auditor; the skills of the audit team; and allocation of community<br />

representatives to an audit team member for the duration of the site visit.<br />

• Site Visit: including travel to the relevant coupe where participants will be able to<br />

observe the audit process and direct questions to their designated audit team<br />

representative; and<br />

• Debrief: to enable the Auditor to provide participants with feedback on coupe<br />

compliance and field observations; and to allow participants to direct any further<br />

questions toward the Auditor and/or audit team.<br />

Participants may be required to sign a record of attendance at the commencement<br />

and end of the Open Day. DSE will coordinate health and safety issues for community<br />

members who attend the open day.<br />

DSE will determine the location and attendance limits for each Community Open Day<br />

through consideration of health and safety, accessibility of the coupe and the level of<br />

community interest in the area to be audited. The number of Community Open Days<br />

held within any audit period will be at the discretion of DSE and will depend largely on<br />

which FMAs are included in the audit, the availability of resources and the harvesting<br />

lifecycle stage being audited. Community representatives will not be able to visit<br />

‘active’ harvesting coupes for health and safety reasons.<br />

DSE will select community representatives on a first-come, first-served basis, after<br />

making information available about the timing and location of such Community Open<br />

Days on the Department’s website and any direct mailing made to stakeholders who<br />

have registered an interest in such events.<br />

FOREST AUDIT PROGRAM – MODULE 2 AUDIT PROCESS PAGE 21