Forest Coupe Plans<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5A – FOREST COUPE PLANS<br />

Ref Origin Section Prescription Audit Criteria Compliance Extent<br />

(E)<br />

5A43<br />

5A44<br />

Fire Salvage<br />

Harvesting<br />

Prescriptions 2009<br />

8 Ash<br />

Exclusion<br />

Areas<br />

Fire Salvage 8.2.1 Green<br />

Harvesting Patch<br />

Prescriptions 2009 Exclusion<br />

Areas<br />

and Mildura FMA;<br />

7. Within 10m of vertical<br />

or near vertical sided<br />

gullies with a depth of<br />

half a metre or more that<br />

are actively eroding;<br />

8. Within 50m of a<br />

silvicultural system<br />

project treatment site(s)<br />

at which long term<br />

ecological monitoring is<br />

being conducted within<br />

the Central FMA.<br />

Identification and marking<br />

of exclusion zones in fire<br />

affected forest stands are<br />

referred to in the Fire<br />

Salvage Harvesting<br />

Prescriptions.<br />

Areas of fire severity class 4<br />

or 5 must be at least 40m<br />

wide to be a green patch<br />

Exclusion zones are in<br />

accordance with the<br />

Prescriptions.<br />

Refer to Workbook B for<br />

Barred Galaxias<br />

Management Prescriptions<br />

Refer to Workbook C for<br />

Habitat Tree Exclusion<br />

Areas<br />

Green patches are<br />

identified adequately in<br />

accordance with the<br />

Prescriptions<br />

Refer to Fire Salvage<br />

Harvesting Prescriptions:<br />

Appendix 1, Green patch<br />

retention by compartment<br />

to determine the<br />

application of the<br />

prescriptions.<br />

Exclusion Zones – Mandatory Actions<br />

Environmental Impact Assessment<br />

Duration<br />

(t)<br />

Auditor Comments<br />

Asset<br />

Value (z) Impact<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 19 OF 22<br />

Forest Coupe Plans<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5A – FOREST COUPE PLANS<br />

Ref Origin Section Prescription Audit Criteria Compliance Extent<br />

(E)<br />

5A45<br />

5A46<br />

5A47<br />

Fire Salvage<br />

Harvesting<br />

Prescriptions 2009<br />

8.2.2 Green<br />

Patch<br />

Exclusion<br />

Areas<br />

Fire Salvage 8.2.3 Green<br />

Harvesting Patch<br />

Prescriptions 2009 Exclusion<br />

Areas<br />

Fire Salvage<br />

Harvesting<br />

Prescriptions 2009<br />

8.2.4 Green<br />

Patch<br />

Exclusion<br />

Areas<br />

Where less than 15% of<br />

Ash dominated forest within<br />

a compartment is classified<br />

as fire severity class of 4 or<br />

5, retain all green patches<br />

greater than 0.5ha in area.<br />

Where more than 15% and<br />

less than 40% of Ash<br />

dominated forest within a<br />

compartment is classified as<br />

fire severity class 4 or 5,<br />

retain, in exclusion areas,<br />

all green patches greater<br />

than 5ha in area.<br />

Green patches may be<br />

harvested where, within a<br />

compartment, more than<br />

40% Ash dominated forest<br />

is classified as fire severity<br />

class 4 or 5. The total area<br />

of fire severity class 4 or 5<br />

Ash within a salvage coupe<br />

must not exceed 40ha.<br />

Green patches have been<br />

maintained in accordance<br />

with the Prescriptions and<br />

meet the area<br />

specifications.<br />

Green patches have been<br />

maintained in accordance<br />

with the Prescriptions and<br />

meet the area<br />

specifications.<br />

Percentage of Ash is larger<br />

than 40% if green patches<br />

have been harvested.<br />

Total area of fire salvage<br />

does not exceed 40ha.<br />

Exclusion Zones – Mandatory Actions<br />

Environmental Impact Assessment<br />

Duration<br />

(t)<br />

Auditor Comments<br />

Asset<br />

Value (z) Impact<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 20 OF 22