Module 5 - VicForests
Module 5 - VicForests
Module 5 - VicForests
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5E – ROADING<br />
Roading - Mandatory Actions<br />
Ref Origin Section Prescription Audit Criteria Compliance<br />
5E68 Management 1.6.6.1<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
5E69 Management 1.6.6.1<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
5E70 Management 1.6.6.1<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
Seasonal and temporary closures<br />
of permanent roads must be<br />
recorded in accordance with the<br />
standards specified in Worksite<br />
Traffic Management AS 1742.3<br />
and Code of Practice for Worksite<br />
Safety - Traffic Management,<br />
issued under the Road<br />
Management Act 2004.<br />
Seasonal closures of permanent<br />
roads must be gazetted annually.<br />
Where <strong>VicForests</strong> requires a<br />
permanent road to be<br />
temporarily closed (including<br />
erection of bunting barriers),<br />
<strong>VicForests</strong> must submit a<br />
completed Road Closure Plan<br />
(refer to Schedule 9 of these<br />
Procedures) to the Area Manager<br />
for approval.<br />
Seasonal and temporary<br />
road closures comply with<br />
the Standards and the Code<br />
of Practice for Worksite<br />
Safety - Traffic<br />
Management.<br />
Seasonal closures of<br />
permanent road have been<br />
Gazetted as required.<br />
Record of approval made in<br />
coupe diary and available<br />
for inspection.<br />
Environmental Impact Assessment<br />
Extent<br />
(E)<br />
Duration<br />
(t)<br />
Asset Impact<br />
Value (z)<br />
Auditor Comments<br />
Road Closure<br />
FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE 33 OF 43<br />
FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5E – ROADING<br />
Roading - Mandatory Actions<br />
Ref Origin Section Prescription Audit Criteria Compliance<br />
5E71 Management 1.6.6.1<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
All roads must be temporarily<br />
closed to general traffic, or have<br />
traffic control measures<br />
implemented in accordance with<br />
1.6.6.3 of the Management<br />
Procedures, when timber<br />
harvesting operations and<br />
associated activities or prescribed<br />
burning conducted on or near a<br />
road presents a risk to road<br />
users.<br />
Records of temporary road<br />
closures in response to risks<br />
to road users are made in<br />
coupe diary and available<br />
for inspection.<br />
Environmental Impact Assessment<br />
Extent<br />
(E)<br />
Duration<br />
(t)<br />
Asset Impact<br />
Value (z)<br />
Auditor Comments<br />
Road Closure<br />
5E72 Management 1.6.6.1<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
5E73 Management 1.6.6.2<br />
Procedures Forest<br />
for timber Roads<br />
harvesting,<br />
roading and<br />
regeneration<br />
in Victoria’s<br />
State forests,<br />
2009<br />
All roads must be temporarily<br />
closed to the carting of timber<br />
resources and forest produce<br />
during wet weather, including<br />
when snow is lying on the<br />
ground, or dry periods if there is<br />
a significant chance that:<br />
i). the road surface will<br />
deteriorate; or<br />
ii). watercourses will be polluted.<br />
The approach to any bridge,<br />
culvert or log fill crossing that<br />
has been removed must be<br />
adequately drained to restrict soil<br />
movement into a stream or<br />
waterway.<br />
Record of road closures<br />
made in coupe diary and<br />
available for inspection and<br />
no observed road damage<br />
or pollution of a waterway<br />
resulting from cartage.<br />
Temporary bridges, culverts<br />
and crossings have been<br />
closed and drained<br />
effectively.<br />
FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE 34 OF 43