12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Reserved Area Protection<br />

• Assess at least two 200 m lengths of buffer strip. Measure widths for at least 2<br />

and up to 4 points along the two strips. Record results and comments on<br />

compliance with relevant prescriptions.<br />

• Assess rainforest buffer as much as possible during coupe inspection. Measure<br />

widths for at least 2 and up to 4 points along one 200 m strip. Record results and<br />

comments on compliance with relevant prescriptions.<br />

• Assess special habitat or landscape buffers. Measure widths for at least 2 and up<br />

to 4 points along one 200 m strip. Record results and comments on compliance<br />

with relevant prescriptions.<br />

• Note a maximum of 400 m of buffer is measured at each coupe comprising a<br />

combination of streamside reserve, special habitat, landscape or rainforest.<br />

• Assess filter strip as much as possible during coupe inspection. Measure widths<br />

for at least 2 and up to 4 points along one 100 m strip where necessary to<br />

determine compliance to relevant prescriptions. Record results and comments on<br />

compliance with relevant prescriptions.<br />

Habitat Trees<br />

• Assess coupe for retention of prescribed numbers of habitat trees. Record number<br />

inspected and where harvesting operations have damaged retained trees and/or<br />

where debris is accumulated around the tree base and does not comply with<br />

prescriptions. Record general comments on selection and protection of retained<br />

trees.<br />

Boundary Tracks<br />

• Inspect as much boundary track as possible (at least 100 m) during coupe<br />

inspection. Record measured distance of boundary track inspected and assess<br />

whether drainage structures are within prescriptive requirements.<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE A-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!