12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5C – BIODIVERSITY CONSERVATION<br />

Previous Key Audit Findings<br />

What key findings were observed during the previous environmental audit<br />

The auditor will require an understanding of previous key findings in order to provide commentary on current practices and improvements over time.<br />

Comments:<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 3 OF 22<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5C – BIODIVERSITY CONSERVATION<br />

Forest Audit – Coupe Information<br />

Coupe number: «Recce_allCoupe» Coupe name: «CoupeName»<br />

District: «DistrictName» Coupe area: «MaxOfProposedNetArea» ha -<br />

Elevation (m): ASL): «Elevation» m Stand Description / Vol: e.g. Mature «MaxOfLogVolume» m3<br />

General aspect: e.g. SE Forest type: «ForestType»<br />

Supervisor (FO): Supervisor – «LastOfSupervisor»<br />

Team Leader –<br />

«LastOfTeamLeader»<br />

Endorsement<br />

Categories:<br />

Flora &<br />

Fauna<br />

Catchment Parks Forest<br />

Mgt<br />

Forestry Victoria Fire Mgt DSE<br />

Region<br />

Contractor:<br />

«LastOfContractor»<br />

Silvicultural system: «SilvicultureSystem» SEH topsoil / subsoil: «TopsoilErosion»/ «SubsoilErosion»<br />

Machinery used: Skidder / Hand Fallen / Mechanical Soil Permeability:<br />

Harvest<br />

Coupe Operation: «MinOfStartDate» to<br />

Grid Reference:<br />

E: «EastingADG66»N«NorthingADG66»<br />

«MaxOfFinishDate»<br />

Comments:<br />

Flora: «FloraValues»<br />

Fauna: «FaunaValues»<br />

Absolute Risk Rating: «Abs_risk»<br />

Special (salvage)<br />

plan<br />

Are there SPZ /<br />

SMZs<br />

People Present:<br />

Selection Values:<br />

Slope Class – Soil Erosion<br />

Hazard – Silvicultural System,<br />

Property Restrictions<br />

«FloraF<br />

auna»<br />

«Water»<br />

«Parks<br />

»<br />

«Type» Slope (º) Low-High: «SlopeMin»- «SlopeMax»<br />

«ManagementZone» Season of operation: «HarvestSeason»<br />

Auditor and Audit Team:<br />

«Forest<br />

Mgmt»<br />

«<strong>VicForests</strong>» «FireMgmt» «RegM<br />

gmt»<br />

Slope – «Slope_risk»Soil erosion – «Soil_erosion_risk»Silviculture –<br />

«Silv_risk»and Protection – «Protection_risk»<br />

Audit date:<br />

Auditees:<br />

AA = Alpine Ash, BG = Blue Gum, CT = Cut Tail, CY = Mountain Grey Gum, DA = Mountain Gum, MA = Mountain Ash, MM = Messmate, OS = Other Species, PM = Peppermint Spp, SG = Shinning Gum, ST = Silvertop Ash, VM = Manna Gum, WS = White<br />

Stringybark<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 4 OF 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!