12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5A – FOREST COUPE PLANS<br />

Previous Key Audit Findings<br />

What key findings were observed during the previous environmental audit<br />

The auditor will require an understanding of previous key findings in order to provide commentary on current practices and improvements over time.<br />

Comments:<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 3 OF 22<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5A – FOREST COUPE PLANS<br />

Forest Audit – Coupe Information<br />

Coupe number: «Recce_allCoupe» Coupe name: «CoupeName»<br />

District: «DistrictName» Coupe area: «MaxOfProposedNetArea» ha -<br />

Elevation (m): ASL): «Elevation» m Stand Description / Vol: e.g. Mature «MaxOfLogVolume» m3<br />

General aspect: e.g. SE Forest type: «ForestType»<br />

Supervisor (FO): Supervisor – «LastOfSupervisor»<br />

Team Leader –<br />

«LastOfTeamLeader»<br />

Endorsement<br />

Categories:<br />

Flora &<br />

Fauna<br />

Catchment Parks Forest<br />

Mgt<br />

Forestry Victoria Fire Mgt DSE<br />

Region<br />

Contractor:<br />

«LastOfContractor»<br />

Silvicultural system: «SilvicultureSystem» SEH topsoil / subsoil: «TopsoilErosion»/ «SubsoilErosion»<br />

Machinery used: Skidder / Hand Fallen / Mechanical Soil Permeability:<br />

Harvest<br />

Coupe Operation: «MinOfStartDate» to<br />

Grid Reference:<br />

E: «EastingADG66»N«NorthingADG66»<br />

«MaxOfFinishDate»<br />

Comments:<br />

Flora: «FloraValues»<br />

Fauna: «FaunaValues»<br />

Absolute Risk Rating: «Abs_risk»<br />

Special (salvage)<br />

plan<br />

Are there SPZ /<br />

SMZs<br />

People Present:<br />

Selection Values:<br />

Slope Class – Soil Erosion<br />

Hazard – Silvicultural System,<br />

Property Restrictions<br />

«FloraF<br />

auna»<br />

«Water»<br />

«Parks<br />

»<br />

«Type» Slope (º) Low-High: «SlopeMin»- «SlopeMax»<br />

«ManagementZone» Season of operation: «HarvestSeason»<br />

Auditor and Audit Team:<br />

EPA representative:<br />

District / other staff (name):<br />

Observer(s):<br />

«Forest<br />

Mgmt»<br />

«<strong>VicForests</strong>» «FireMgmt» «RegM<br />

gmt»<br />

Slope – «Slope_risk»Soil erosion – «Soil_erosion_risk»Silviculture –<br />

«Silv_risk»and Protection – «Protection_risk»<br />

Audit date:<br />

AA = Alpine Ash, BG = Blue Gum, CT = Cut Tail, CY = Mountain Grey Gum, DA = Mountain Gum, MA = Mountain Ash, MM = Messmate, OS = Other Species, PM = Peppermint Spp, SG = Shinning Gum, ST = Silvertop Ash, VM = Manna Gum, WS = White<br />

Stringybark<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 4 OF 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!