FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5E – ROADING<br />

Roading – Mandatory Actions<br />

Construction<br />

Environmental Impact Assessment Auditor Comments<br />

Ref Origin Section Prescription Audit Criteria Compliance Extent Duration Asset<br />

(E) (t) Value (z) Impact<br />

5E57 Code of<br />

Practice for<br />

Timber<br />

Production<br />

2007<br />

2.4.3 Road Road construction<br />

Construction operations must ensure<br />

that: cement, raw<br />

concrete, soil fill and<br />

other road making<br />

materials are not spilt<br />

into watercourses during<br />

any construction.<br />

Materials are not placed<br />

where they can enter a<br />

stream or wetland.<br />

Comment:<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE 27 OF 43<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5E – ROADING<br />

Roading – Mandatory Actions<br />

Maintenance<br />

Ref Origin Section Prescription Audit Criteria Compliance<br />

5E58 Code of<br />

Practice for<br />

Timber<br />

Production<br />

2007<br />

5E59 Code of<br />

Practice for<br />

Timber<br />

Production<br />

2007<br />

Road maintenance must<br />

2.4.4 Road<br />

be undertaken to<br />

Maintenance<br />

minimise erosion and to<br />

protect water quality.<br />

2.4.4 Road<br />

Maintenance<br />

5E60 Management 1.6.5 Forest<br />

Procedures Roads<br />

for timber<br />

harvesting,<br />

roading and<br />

regeneration<br />

in Victoria’s<br />

State forests,<br />

2009<br />

5E61 Management 1.6.5 Forest<br />

Procedures Roads<br />

for timber<br />

harvesting,<br />

roading and<br />

regeneration<br />

in Victoria’s<br />

State forests,<br />

2009<br />

Road drainage systems<br />

must be maintained to<br />

minimise erosion and the<br />

discharge of sediment<br />

into waterways.<br />

Roads and tracks must be<br />

maintained so that<br />

drainage is kept free of<br />

debris.<br />

Roads and tracks must be<br />

maintained so that<br />

discharge of turbid water<br />

into streams or wetlands<br />

is minimised.<br />

Roads are maintained in<br />

accordance with the<br />

requirements.<br />

Roads drainage is<br />

maintained in accordance<br />

with the requirements<br />

and there is no evidence<br />

of discharge of sediment<br />

into waterways.<br />

Road and track drainage<br />

is maintained in<br />

accordance with the<br />

requirements and there is<br />

no debris located within<br />

drainage structures.<br />

Roads and tracks are<br />

maintained in accordance<br />

with the requirements<br />

and there is no evidence<br />

of discharge of turbid<br />

water into waterways or<br />

wetlands.<br />

Environmental Impact Assessment<br />

Extent<br />

(E)<br />

Duration<br />

(t)<br />

Asset<br />

Value (z) Impact<br />

Auditor Comments<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE PAGE 28 OF 43