12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5F – COUPE INFRASTRUCTURE<br />

Coupe Infrastructure<br />

Boundary Tracks – Mandatory Actions<br />

Ref<br />

Origin Section Prescription Audit Criteria Compliance<br />

Environmental Impact Assessment<br />

Auditor Comments<br />

Extent<br />

(E)<br />

Duration<br />

(t)<br />

Asset<br />

Value (z)<br />

Impact<br />

Comments:<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 19 OF 24<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5F – COUPE INFRASTRUCTURE<br />

Coupe Infrastructure<br />

Boundary Tracks – Guidance<br />

Ref Origin Section Prescription Audit Criteria Auditor Comments<br />

5F27 Code of Practice for<br />

Timber Production<br />

2007<br />

2.5.2 Coupe Tracks should be designed with Design is adequate<br />

Infrastructur minimal slope and appropriate<br />

e<br />

cross-fall to assist drainage. Fire Endorsement Category:<br />

«FireMgmt»<br />

5F28 Fire Salvage<br />

Harvesting<br />

Prescriptions 2009<br />

Comments:<br />

4.3 Water<br />

Quality<br />

Where harvesting in fire salvage Boundary tracks are located<br />

coupes, boundary tracks should appropriately<br />

be located at least 40m from<br />

any permanent stream or<br />

wetland.<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 20 OF 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!