12.01.2015 Views

Module 5 - VicForests

Module 5 - VicForests

Module 5 - VicForests

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5F – COUPE INFRASTRUCTURE<br />

Coupe Infrastructure<br />

Snig and Forwarding Tracks – Mandatory<br />

Actions<br />

5F19<br />

5F20<br />

Origin Section Prescription Audit Criteria Compliance<br />

Management<br />

Procedures<br />

for timber<br />

harvesting,<br />

roading and<br />

regeneration<br />

in Victoria’s<br />

State forests,<br />

2009<br />

Management<br />

Procedures<br />

for timber<br />

harvesting,<br />

roading and<br />

regeneration<br />

in Victoria’s<br />

State forests,<br />

2009<br />

1.3.4 Snig<br />

Tracks and<br />

Landings<br />

1.3.4 Snig<br />

Tracks and<br />

Landings<br />

Where cording is used,<br />

cording must be placed on<br />

snig tracks before machinery<br />

causes soil damage.<br />

All snig tracks must be<br />

rehabilitated to prevent<br />

unacceptable movement of<br />

soil down or from the track<br />

surface and soil movement<br />

into streams.<br />

Machinery has not<br />

caused soil damage<br />

NFSG #11<br />

Rehabilitation meets the<br />

requirements.<br />

Environmental Impact Assessment<br />

Extent<br />

(E)<br />

Duration<br />

(t)<br />

Asset Value<br />

(z)<br />

Impact<br />

Auditor Comments<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 15 OF 24<br />

FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5F – COUPE INFRASTRUCTURE<br />

Coupe Infrastructure<br />

Snig and Forwarding Tracks – Mandatory<br />

Actions<br />

Comments:<br />

Origin Section Prescription Audit Criteria Compliance<br />

Environmental Impact Assessment<br />

Extent<br />

(E)<br />

Duration<br />

(t)<br />

Asset Value<br />

(z)<br />

Impact<br />

Auditor Comments<br />

Coupe Infrastructure<br />

Snig and Forwarding Tracks – Guidance<br />

Origin Section Prescription Audit Criteria Auditor Comments<br />

5F21 Code of Practice 2.5.2 Coupe<br />

for Timber Infrastructure<br />

Production 2007<br />

Location and alignment of snig tracks and forwarding<br />

tracks should ensure that they can be effectively crossdrained<br />

and out-sloped, where required.<br />

Tracks have drainage<br />

structures or outsloping that<br />

meet the requirements.<br />

FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 16 OF 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!