Module 5 - VicForests
Module 5 - VicForests
Module 5 - VicForests
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5B – WATER QUALITY, RIVER HEALTH AND SOIL PROTECTION<br />
Water Quality, River Health and Soil<br />
Protection<br />
Camp Maintenance, Fuel Storage & Waste Disposal –<br />
Mandatory Actions<br />
Ref Origin Section Prescription Audit Criteria Compliance<br />
5B40 Code of<br />
Practice for<br />
Timber<br />
Production<br />
2007<br />
5B41 Code of<br />
Practice for<br />
Timber<br />
Production<br />
2007<br />
2.2.1<br />
Water<br />
Quality,<br />
River<br />
Health<br />
and Soil<br />
Protection<br />
2.2.1<br />
Water<br />
Quality,<br />
River<br />
Health<br />
and Soil<br />
Protection<br />
Storage, use and disposal<br />
of petroleum products<br />
and machinery servicing<br />
must not pollute the<br />
environment or result in<br />
littering.<br />
Waste oil, all empty<br />
drums, discarded<br />
machinery parts and<br />
other waste must be<br />
removed from the forest<br />
and taken to an approved<br />
disposal facility.<br />
Evidence that refuelling<br />
and/or maintenance is not<br />
located close to sensitive<br />
sites.<br />
No visible signs of<br />
pollution or litter.<br />
Documented evidence of<br />
disposal of wastes to an<br />
approved disposal facility.<br />
No waste on site.<br />
Environmental Impact Assessment<br />
Extent<br />
(E)<br />
Duration<br />
(t)<br />
Asset<br />
Value (z)<br />
Impact<br />
Auditor Comments<br />
5B42 Code of<br />
Practice for<br />
Timber<br />
Production<br />
2007<br />
Comments:<br />
2.2.1<br />
Water<br />
Quality,<br />
River<br />
Health<br />
and Soil<br />
Protection<br />
Toilet wastes must not be<br />
allowed to enter a<br />
waterway.<br />
Toilet waste has been<br />
managed appropriately.<br />
FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 23 OF 30<br />
FOREST AUDIT PROGRAM, AUDIT WORKBOOK 5B – WATER QUALITY, RIVER HEALTH AND SOIL PROTECTION<br />
Water Quality, River Health and Soil Protection<br />
Water Catchments – Mandatory Actions<br />
Ref Origin Section Prescription Audit Criteria Compliance<br />
Extent (E) Duration<br />
(t)<br />
5B43 Code of<br />
Practice for<br />
Timber<br />
Production<br />
2007<br />
2.2.1 Measures to reduce the<br />
Water impact of timber<br />
Quality, harvesting on water<br />
River quality and river health<br />
Health and must take account of<br />
Soil other requirements set<br />
Protection out in Special Area Plans<br />
made under the<br />
Catchment and Land<br />
Protection Act 1994.<br />
Special Area Plans have<br />
been considered as part of<br />
coupe management<br />
Environmental Impact Assessment<br />
Asset<br />
Value (z)<br />
Impact<br />
Auditor Comments<br />
5B44 Code of<br />
Practice for<br />
Timber<br />
Production<br />
2007<br />
2.2.1 The Catchment and Land<br />
Water Protection Act 1994<br />
Quality, requires all landholders to<br />
River control pest animals and<br />
Health and noxious weeds on their<br />
Soil property.<br />
Protection<br />
No apparent pest animals<br />
or weeds; or if small<br />
numbers present, evidence<br />
of an appropriate control<br />
and monitoring program<br />
having been implemented.<br />
5B45 Management 1.4.2 (a) Timber harvesting<br />
Procedures<br />
operations must be<br />
for timber<br />
excluded from Heritage<br />
harvesting,<br />
River Areas and Natural<br />
roading and<br />
Catchment Areas in<br />
regeneration<br />
accordance with Heritage<br />
in Victoria’s<br />
Rivers Act 1992 (except<br />
State<br />
where permitted in parts<br />
forests,<br />
of the Goulburn and the<br />
2009<br />
Ovens Heritage River<br />
Areas).<br />
Boundaries and exclusion<br />
areas of Heritage River<br />
Areas and Natural<br />
Catchment Areas (as<br />
defined in the Act) are<br />
identified in the field<br />
through ground<br />
observation and are<br />
specified on the Forest<br />
Coupe Plan.<br />
FOREST AUDIT PROGRAM – MODULE 5 HARVESTING AND CLOSURE, APRIL 2010 PAGE 24 OF 30