15.01.2015 Views

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IX-ll<br />

-6 -<br />

Case No. 3316<br />

Order No. R-ll1-P<br />

D. DRILLING AND CASING PROGRAM<br />

(1 I For the purpose 0 f the regu Ia t ions and the<br />

drilling <strong>of</strong> wells for oil and gas. shallow and deep zones are<br />

defined as follows:<br />

{a I The sh.. I low zone sha I line Iude a I I<br />

formations above the base <strong>of</strong> the Delaware Mountain Group or,<br />

above a depth <strong>of</strong> 5,000 feet, whichever is lesser.<br />

(bl The deep zone shall include all formations<br />

below the base <strong>of</strong> the Delaware Mountain Group or. below a<br />

depth <strong>of</strong> 5.000 feet. whichever is lesser.<br />

leI For the purpose <strong>of</strong> identification, the<br />

base <strong>of</strong> the Delaware Mountain Group is hereby identified as<br />

the geophysical log marker found at a depth <strong>of</strong> 7/185 feet in<br />

the Richardsoll and Bass No.1 Rodke well in Section 27,<br />

Township 20 South, Range 31 East, NMPM. Eddy County, New<br />

Mexico.<br />

{21 Surface Casing String:<br />

(al A surface casing string <strong>of</strong> new or used oil<br />

field casing in good condition shall be set in the "Red Be .<br />

section <strong>of</strong> the basal Rustler formation irrrnediately above ttle<br />

salt section, or in the anhydrite at the top <strong>of</strong> the salt<br />

section, as determined necessary by the rpgulatory<br />

r~presenta t i ve approv i og the dr ill i "g opera t ions. and the<br />

cement shal I be circulated to the surface.<br />

{b} Cement shal I be allowed to stand a minimum<br />

<strong>of</strong> twelve (121 hours under pressure and a total <strong>of</strong> twenty-four<br />

(H) hours before drilling the plug or initiating tests.<br />

(c) Casing and water-shut-<strong>of</strong>f tests shall be<br />

made both before and after drilling the plug and below the<br />

casing seat as follows:<br />

0;'"<br />

..,<br />

(il If rolilry tonls arn tI!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!