IX-14<br />

-9-<br />

Case No. 9316<br />

Order No. R-11i-P<br />

(4'<br />

Intermediate String:<br />

( a I - d r ill i ng we lis toth e deep zon e for 0 i I<br />

or gas, tht operator shall have the option <strong>of</strong> running an<br />

intermediate string <strong>of</strong> pipe, "ml"ss the Division requires an<br />

intermedlats string be run.<br />

(bl Cement ing procedures and casing tests for<br />

the intermediate string shall be the same as provider under<br />

sub-sections D (31 (cl,- (el and (f) for the salt pr'_ action<br />

5 t ring.- '<br />

(5) Production String:<br />

( a J<br />

through the 0 i I or<br />

follows:<br />

A production string shal I be set on top or<br />

gas pa zone and sha II be cemented as<br />

( I J For we II s dr i (I ed to the sha II ow zone<br />

the production string shall be cemented to<br />

the surface i f th~ "at t protection string<br />

was cemented onl' Ith a nominal volume<br />

for testing purposes, in which case the<br />

.~:l't protection string can be cut and<br />

;:''-' ed be fore the produc t ion s t ring is<br />

cemented: provided. that if the sal t<br />

protection string was cemented to the<br />

surface. the production string shall be<br />

cemented with a volume adecuate to protect<br />

the pay zone and the cas i r:g above such<br />

zone.<br />

( iiI For we I Is dr i I Ied to the deep zone,<br />

the production string shall be cemented<br />

with a volume adequate to protect the pay<br />

zone and the casing above such zone:<br />

prOVided, that if no intermediate string<br />

sha I I have been run and cemented to the<br />

surface. the production string shall be<br />

cemented to the surface.<br />

bl Cementing procedures and cas;ng tests for<br />

the prOduction string shall be the same as provided under<br />

sub-section D (3) (cl. {el and (f) for the salt I'lrntection<br />

string: however if high pressure oi I or gas production is<br />

discovered in an area the Division may promulgate the<br />

necessary rules to prev'nt the charging <strong>of</strong> the salt section<br />

<strong>Information</strong> <strong>Only</strong><br />

,