15.01.2015 Views

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IX-48<br />

Federal R~ster " Vol. 53, No, ::3 I Friday. November 18, 1988 I Rule. and Regulation. 4630;<br />

(<br />

'-<br />

l<br />

Vtolation: MajQt'.<br />

Ccr:-t!ctive Action.: 1:1lta11 the<br />

equipment as specified.<br />

Norma! Abalement Period: Prompt<br />

ccrrec':lo" required.<br />

vii, When the BOPE caMot functio~ to<br />

secure Ihe hole, the hote .haC··"<br />

u~cured using cement. retriev;;l.,;ie<br />

packer or a bndge plug packer, bridge<br />

plug. or other acceptable approved<br />

melhod to assure 5afe well conditions.<br />

Violation:. Mejor.<br />

Corrective Action: lr.staU the<br />

equipment as specified.<br />

Nonna!. Abatement Period; Prompt<br />

carnetian required.<br />

b. Minimum standard! and<br />

enforcement provisions for chok.<br />

manifold equipmenL i. All chok. lines<br />

shaU be straight linu unlesllums use<br />

te. block. or are talleted with running<br />

t.... and shall be anchored to prev.nt<br />

wbip and reduce vibration..<br />

Violation: Minor<br />

Corrective Action: l.."1.Stall the<br />

equipment as 'llecilied.<br />

Normal Abatement Period; 14 hours.<br />

ii. Chcke manifold equipment<br />

configuration shall be functionally<br />

.quival.nt to the allll"'llri.t. example<br />

diagram shown in Attac:hm.nt1 <strong>of</strong> thi.<br />

Order,<br />

'<br />

Violation: Minor<br />

Comctive Action: Install the<br />

equipment II Ipecified. .<br />

No""al Abat.men' ".riod; Prompt<br />

ccttection required..<br />

iii, All valves (e"clllt chok..) ill the<br />

kill lin., choke mlnifold. Ind chokl linl '<br />

shall bl • type thai do.. not ","triet the<br />

flow (full opening) Ind that allows a<br />

'--- ..........._--...<br />

.<br />

straight through flow (oame .cloreem.nt<br />

as item ii).<br />

· iv. Pressure gauges in the weD control<br />

system .hall be a type de.igned for<br />

drilling fluid .uvice lsame enforce::nent<br />

aJ above).<br />

c. Minimum st(Jndard~ and<br />

enf<strong>of</strong>T2ment prOV;SJon~ for pnssun<br />

accumulator sY3tem. t. 2..'-rf IYltem­<br />

Icc"",ulalor .hall have .ufficle~t<br />

capacity to dOle aU SCPO. and ret.a.iD.<br />

ZOO ll.i above precharg., Nitro,.~<br />

bottles that meet manulactunr'.<br />

Ipecific.ations may be uaed as the<br />

blckup to the required indep.ndent<br />

power IOurc••<br />

Violation; tvtinor<br />

Con-active Action: Install the<br />

equipment eo sll.ciffed.<br />

Norm.IAbatement Period: 14 hDunI.<br />

ii. 3M iYltem--occumulator shall hav.<br />

lufficient capacity to open the<br />

hydraulically-controU.d choke lin.<br />

valve (if.o equipp.d). cleoe all rOllll<br />

plus the annual preventer. and retaiD ..<br />

minimWll <strong>of</strong> 100 pli above prechUlle on<br />

the clolinglllanUold without thl u.. <strong>of</strong><br />

the elo.illl W1it Pllll:lpl. Thi. II a<br />

tIlinilllwn requirement Th. fluid<br />

re..rvoir capacity Ihall b. doubl. the<br />

Ic=u1atar capacity and fluid level . '<br />

maintained .tlll&llWacturer'l<br />

recolll.lllend.tionL The 3M system oh.n<br />

hava 2 indep.ndent power aourcu to<br />

clore the prev.nt..·~. Nitrogen botll.. (3<br />

minimwn) may be 1 <strong>of</strong> the independent<br />

power lource••nd. i! 10, .hall maintaill<br />

I ch.rge equal to the manufacturer'I<br />

.pec:ificadcnl. .<br />

Violation: Minor.<br />

. ,__<br />

Correctlve,Actlon: in.t.ll the<br />

equipm.nt a. specified.<br />

<strong>Information</strong> <strong>Only</strong><br />

•<br />

Normal Abatement Pe:iod: 2. hours.<br />

iii. SM and higher sy,ternaccumuJator<br />

IhaH have sufficient<br />

capacity 10 open :he hydraulically.<br />

e.ontrolled gate vah.. e (if 10 eqUipped)<br />

and dose all rams plus the ar.nular<br />

preventer (for 3 ram !y'S!e:~s add a SO<br />

percent &&!tty factor to r.ompensale for<br />

any fluid 1011 in '>e: cont.""01 Iystem or<br />

preventers) and :'l';,ain a mJr'Jmum<br />

pres~ure <strong>of</strong>.zoo pSI above precharge OD<br />

the dOling manifold without use <strong>of</strong> the<br />

dosing wtit pumP!. The re!e:"'Voir<br />

capacity shall be double the<br />

ICCU%:Ilulator capac:ty. and t..I"e fluid lev'!!<br />

.hall boP." cc.aintained at manufacturer',<br />

recommendation•. Two U':.de;:tendent<br />

.ourees <strong>of</strong> power shall be .,,·ailable for<br />

llowering the closing u:til pump"<br />

Suffici.nt nitrogen botlle. are sUllahl.<br />

•• I backup power souree only, and<br />

shall b. rechalied when the pressure<br />

raUs below C'lanu!act'W'er',<br />

IpecwcationJ.<br />

Viol.tlon: Minor.<br />

Cometive Action: In.taU t~e<br />

equipmell1 II specifi.d.<br />

No""ai Abatement Period: 14 hoW'S.<br />

cU<br />

&lid sl:.. <strong>of</strong> Pllll:lPS 10 thaL with the<br />

aCCllll:lwatar syatem Iaolaled fr=I<br />

.ervlca. the pump. IbaU bt capabl, <strong>of</strong> '<br />

opening the hydraulicallY-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!