15.01.2015 Views

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IX-12<br />

-7-<br />

ea s e No. 9316<br />

O~de~ No. R-Ill-P<br />

hole does no~ remain d~y for ~ reriod <strong>of</strong><br />

one hou~, co~~ective measu~es shall be<br />

appl ied.<br />

casing st~ing<br />

zones.<br />

(d) The above ~equi ~ements fo~ the su~face<br />

shal I be appl icable to both the shallow and deep<br />

[31 Salt Protection St~jn9:<br />

(al _A-salt protection st~ing <strong>of</strong> new o~ used<br />

oil fi-eld casing In-:.good condition shall be set not less than<br />

one hund~ed (100) feet nor mo~e than six hund~ed (600) feet<br />

below the base <strong>of</strong> the salt section: provided that such st~ing<br />

shall not be set below the top <strong>of</strong> the highest known 0; I O~ gas<br />

zone. WIth prior approval <strong>of</strong> the oeo Dlst~ict Supe~viso~ the<br />

wellbo~e may be deviated f~om the ve~tlcal afte~ completely<br />

penetrating Ma~ker Bed No. 126 [USGS I but that section <strong>of</strong> the<br />

casing set in the deviated portion <strong>of</strong> the wellbo~e shal r be<br />

centralized at each joint.<br />

cemented, as<br />

(b) The salt protection st~ing shall be<br />

follows:<br />

(i) Fo~ wells d~il'ed to the shallow<br />

zone, the st~lng may be cemented with a<br />

nominal volume <strong>of</strong> cement fo~ testing<br />

purposes only. I ( the explorato~y test<br />

well is completed as a p~oductive well,<br />

the st~ing shal I be ~e-cemented with<br />

sufficient cement to fi II the annular<br />

space back <strong>of</strong> the pipe f~om the top <strong>of</strong> the<br />

first cementing to the surface or to the<br />

bottom <strong>of</strong> the cellar. or may be cut and<br />

pulled If the production st~jng is<br />

cemented to the surface as provided in<br />

sub-section 0 (5)(a)(i) below.<br />

(il) For wei Is drl "ed to the deep zone,<br />

the st~ing must be cemented wi th<br />

suttlc"lent cement to fill the annula~<br />

space back <strong>of</strong> the pipe from the cas ing ­<br />

seat to the surface or to the bottom ot<br />

the cella~.<br />

(c) If the cement fal Is to ~each the surface or the<br />

bottom <strong>of</strong> the cellar, where required, the top <strong>of</strong> the cement<br />

shall be located by a temperature, gamma ray or other survey<br />

and additional cementing_ shall be done until the cement /s<br />

brought to the point required.<br />

<strong>Information</strong> <strong>Only</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!