15.01.2015 Views

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

Information Only - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Information</strong> <strong>Only</strong><br />

XI-17<br />

Ultimate primary recovery was calculated for 21 wells in the Livingston Ridge<br />

- Lost Tank pool. These wells produce solely or principally from the main pay zone.<br />

A few wells in the southwestern pan <strong>of</strong> Livingston Ridge produce solely from sandstones<br />

in the D zone <strong>of</strong> the lower Brushy Canyon Formation (Fig. 28); ultimate<br />

primary recovery and reserves in those wells are discussed below in the section on the<br />

Los Medanos - Sand Dunes - Ingle Wells complex.<br />

Ultimate primary recovery for the average well completed in the Livingston<br />

Ridge main pay is 89 thousand bbls oil (!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!