Council Minutes 16 April 2007 - Waratah-Wynyard Council
Council Minutes 16 April 2007 - Waratah-Wynyard Council
Council Minutes 16 April 2007 - Waratah-Wynyard Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Planning Authority Reports<br />
5. All deliveries to the development are to be made via the Goldie<br />
Street frontage of the premises.<br />
6. No advertising signs other than those indicated in the<br />
development proposal are to be erected without the approval of<br />
the Director Development Services.<br />
7. No part of the sign hereby permitted is to be internally or<br />
externally illuminated.<br />
8. The use of this development is not to result in the generation of<br />
environmental harm or nuisance as defined in the Environmental<br />
Management and Pollution Control Act 1994.<br />
9. Erosion and sediment controls are to be installed for the duration<br />
of the construction phase so as to limit the loss of soils and other<br />
debris from the site.<br />
10. No material is to be deposited on the road.<br />
11. No damage is to be caused to the road, footpath or other facility.<br />
12. No materials, machinery or operational construction are to be<br />
located on the road, footpath, nature strip or road reservation.<br />
13. The footings of the development are to be constructed such that<br />
no additional loading is placed upon the <strong>Council</strong> stormwater<br />
drainage line that traverses the property. The developer is to<br />
ensure that access remains to inspection openings in the<br />
drainage line and be responsible for ensuring that the drainage<br />
line is maintained in a clear state so that normal stormwater<br />
flows are unimpeded. The footing and access design system is to<br />
be to the satisfaction of <strong>Council</strong>’s Director Engineering Services.<br />
14. The developer is to be responsible for the cost of connection of<br />
the development to the <strong>Council</strong> sewerage network.<br />
15. All costs associated with the proposed development are to be met<br />
by the Developer.<br />
2. Summary<br />
The proposal is for the construction of a Hydrotherapy Centre on land zoned<br />
as Business & Civic at 45 Goldie Street, <strong>Wynyard</strong>. The proposal involves the<br />
construction of a building to house a heated swimming pool, change rooms,<br />
spa, sauna, and a physiotherapist/masseuse consultant’s room.<br />
<strong>Waratah</strong>-<strong>Wynyard</strong> <strong>Council</strong> – Ordinary Meeting <strong>Minutes</strong> – <strong>16</strong> <strong>April</strong> <strong>2007</strong> Page 11